Laserfiche WebLink
Assuming the final pt._. is approved by January 1, 2002, approximat~_~.6 months are available to gather <br />baseline data before mining progresses within a mile of the dam. Because of the relatively short time fxame fox <br />gathering baseline data I would expect Bowie Resources to undertake a veryliberal schedule of monitoring during <br />that 6 month period. <br />I hope the information provided is helpful and the recommendation does not impede the schedule <br />for issuing the permit. As always, call me if you have any question. <br />Sincerely, ^ <br />,~ ~,/J <br />amen G. Norfleet, P.E. <br />Dam Safety Engineer <br />cc: Wayne Schieldt, Division Engineer <br />Alan Pearson, Dam Safety Branch <br />