Laserfiche WebLink
• iii iiiiiiiiiiiuiii ~ <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Urparl mrnl n( Natural Re~nurces <br />I{ I 1 Shaman SL, Room ? I S <br />I)rm ri, l uluradu RONI1 <br />Phunc 1 NI II 746E-1567 <br />In\~{Hl it t{1!lil O6 <br />October 30, 1996 <br />Me. Julie Goettemoeller <br />western Mobile Northern, Inc. <br />1590 W. 12th Avenue <br />Denver, CO 80204 <br />Re: Greeley West Pit, Permit No. M-77-081, Succession Approval, Revision <br />No. SO-002 <br />Dear Me. Goettemoeller: <br />~~I~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCE <br />Roy Romer <br />Governor <br />fames S. Lochhead <br />Executive Direcror <br />Michael B. Long <br />Division Director <br />On October 10, 1996, the Division of Minerals and Geology approved the succession <br />of operators from Western Hobile, Inc to Western Mobile Northern, Inc. for this <br />operation. Western Mobile Northern, Inc. is now the permitted operator of the <br />Greeley West Pit, and as such, ie responsible for all provisions in Permit <br />No. M-77-081, ae well as those specified in the Rules and Regulations. Western <br />Mobile, Inc ie relieved of all responsibilities concerning this operation. <br />Please Note: <br />1. All of the application materials, ae amended and supplemented, are an integral <br />part of your permit. They have been incorporated into the permit by reference. We <br />presume that you have a copy of all of these materials; therefore, none have been <br />enclosed with this mailing. We suggest that you keep a copy of the permit and the <br />permit application at the mining operation as a reference for operating personnel, <br />to help ensure compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a modification to the permit. We suggest <br />consulting the Rules and Regulations and/or contacting us to determine if a <br />modification to the permit is necessary. Rule 1.10 pertains to Amendments, Rule 1.9 <br />to Technical Revisions, and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each year, you must submit an annual fee and <br />annual report to us. Please consult the Rules, Act, and your permit for specific <br />requirements. <br />If you have any questions, contact me. <br />Sincerely, <br />Carl B. Mount <br />Senior Environmental Protection Specialist <br />