My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV100175
DRMS
>
Back File Migration
>
Revision
>
REV100175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:10:39 AM
Creation date
11/22/2007 12:33:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Revision
Doc Date
11/3/1993
Doc Name
REQUEST FOR BOND RELEASE FOR THE BURLINGTON NORTHERN LOADOUT ENERGY FUELS MINING CO RATON CRK
From
DMG
To
ENGINEERING AND ENVIRONMENTAL SERVICES
Type & Sequence
SL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman SL, Room 215 <br />Denver, CO 80207 <br />Phone 13031 866-3 56 7 <br />FA%13031832-8106 <br />November 3, 1993 <br />Mr. Jerry M. Nettleton <br />Terra Matrix <br />Engineering and Environmental Services <br />1475 Pine Grove Road <br />P.O. Box 774018 <br />Steamboat Springs, CO 80477 <br />pF.eprO <br />N~ i <br />~ 4 <br />•.~~ Q: <br />re T6 ' <br />Roy Romer <br />Governor <br />Michael B. Long <br />Division Dueuor <br />RE: Request for Bond Release for the Burlington Northern Loadout, <br />Energy Fuels Mining Company, Raton Creek Mine, Permit No. <br />C-82-055 <br />Dear Mr. Nettleton: <br />The Division has found your application for Phase I, II, and III bond <br />release for the Burlington Northern Loadout complete for the purposes <br />of filing. Rule 3.03.2(2) states that an inspection be conducted <br />within 30 days of receipt of a complete bond release application. <br />The Division hoe scheduled an inspection for 1:00 p.m. on Thursday, <br />November 11, 1993. <br />Individuals from the Division who will be conducting the inspection <br />will include Dan Hernandez and myself. The Albuquerque OSM Office may <br />also be present. You, of .course, are welcome to accompany us if you <br />so desire. <br />The public, per Rule 3.03.2(3), has 30 days from either the last <br />publication of the notice required by Rule 3.03.2(1)(b), or the <br />Division's inspection, whichever is later, to request an informal <br />conference. Informal conferences regarding bond release are described <br />in Rule 3.03.2(4). <br />If no informal conference has been requested, then the Division, per <br />Rule 3.03.2(5)(a), will provide all required parties written <br />notification of the proposed decision. Per Rule 3.03.2(5)(a), <br />interested parties will have 30 days from either the inspection, or <br />the first publication of the Division's proposed decision, whichever <br />is later, to request a public hearing per Rule 3.03.2(6). <br />Per Rule 3.03.2(5)(C), if no request for hearing is received within <br />the 30 day period from the inspection or the first publication of the <br />Division's proposed decision, the proposed decision of the Division <br />shall be final. <br />
The URL can be used to link to this page
Your browser does not support the video tag.