Laserfiche WebLink
Sheet 1 of 3 <br />Colorado Division of Minerals and Geology <br />ESTIMATING FORM - TRUCK/LOADER TEAMS <br />Task No, 1 Prep. By: JD Permit No. M-85-093 <br />Date 0'1/19/9"1 Filename: M043-1 Operation: Red Canyon Quarry <br />Permit Action Phased Recldmation <br />Task Description Replace Growth Medium on Benches <br />________________________________________________ <br />HOURLY EQUIPMENT COSTS: <br />_______~______________ Single, Double or Triple <br />County: FREMONT LaboY Zane 1 Shifts S <br />Equipment Descriptions <br />Truck/load team - Truck GENERIC 38[, 12.0 to 18.0 cy, on or off-hi ghvay <br />- Loader CAT 950E <br />Support equip. - Load area: N/A <br />- Wmp area: N/A <br />Road mdi nt. - Grader N/A <br />- Water T. N/A <br />Truck/Load Team Support Equipment Road Maintenance <br />Truck Loader Load area Dump area Grader Water T. <br />Equrpmen[ Filename: 18CYHLTK 950FLODR N/A N/A N/A N/A <br />Utilization on job <br />-Machine: 100k 90i N/A N/A N/A N/A <br />-Ripper N/A N/A N/A N/A N/A N/A <br />Cos[ Breakdown <br />Ownership cost/hr: 519. 92 $10. 14 N/A N/A N/A N/A <br />Ope rat mg cost/h r: 521. 6] $16. 39 N/A N/A N/A N/A <br />Ripper Op. cost/hr: 50. 00 $0. 00 N/A N/A N/A N/A <br />Operator cost/hr: 522. 03 $22. 04 N/A N/A N/A N/A <br />Unit subtotals 563. 67 $56. 5] N/A N/A N/A N/A <br />q of eqp. unres 3 1 0 0 0 0 <br />Group subtotals- T/L team <br />_ 524'1. <br />______ 45 <br />__ Support: <br />_ SO.OD Rd. <br />________ Ma int.: <br />_ 50.00 <br />________ <br />Total Work Team Cost/Hr $24]. 45 <br />MATERIAL QUANTITIES: <br />Beg. <br />Volume: 14,893 CCY <br />Cu.Yd. ---" "'-- Swell Loose <br />Volume: 14,893 CCY Factor: 1.125 Volume: 16,698 LCY <br />Source of quantity take-off: Calcula[>.on <br />Source of est. swell factor: Program <br />