My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV100119
DRMS
>
Back File Migration
>
Revision
>
REV100119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:10:35 AM
Creation date
11/22/2007 12:33:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994113
IBM Index Class Name
Revision
Doc Date
6/12/2000
Doc Name
ENGINEERED PLANS FOR LOWER PATHFINDER ROADWAY
From
TANDEM INC
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />centerline stationing at 100-foot intervals, <br />dimensions of all road elements, curbs, gutters, <br />utilities easements, and other structures, limits <br />and inclination of cut and fill slopes with new <br />and existing elevation contours, and location and <br />size of culverts designating the type and gauge or <br />strength classification and the estimated flow <br />along with data assumed in estimating the flow; <br />X. North arrow, scale, street names, drainage <br />patterns, and typical road cross_sections; <br />XI. Construction plans for all structures such as <br />bridges, box culverts, and guardrails.; <br />XI2. A statement defining scope and work period for <br />each stage of construction and identifying party <br />or parties responsible for construction; and <br />XIII.Letters from utility companies, ditch companies, <br />fire protection districts, and other interested <br />parties or agencies involved stating their <br />approval of any structure constructed within their <br />right-of-way or that may influence their rights or <br />interests. <br />5-501 I. Bonding Requirements <br />All proposed road development not bonded as part of <br />subdivision approval (see Section 3-12) shall be bonded <br />through an escrow account or uncancellable surety <br />secured unto the County and acceptable to the County <br />Attorney in 125 percent of the amount of the estimated <br />construction cost as approved by the ~=ounty Engineer. <br />Bonds shall be forfeited if work is n~~t completed in <br />accordance with the approved plans an~i specifications, <br />or if in the opinion of the County Engineer and/or Road <br />Superintendent, work is not progressi;ag satisfactorily. <br />As logical units of work are completed and approved by <br />the County Engineer, application may lie made for <br />partial release of bond. <br />5-501 J. Inspection of Work <br />During road construction, the project design engineer <br />shall at the expense of the developer inspect the work <br />of the contractor(s) involved, providEa status reports <br />to the County Engineer monthly or more frequently (as <br />required by the County Engineer), and review and <br />certify to the County Engineer work completed in <br />conjunction with requests for partial release of bond <br />under the Administrative Review Procedure established <br />Page 5-5-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.