My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV100103
DRMS
>
Back File Migration
>
Revision
>
REV100103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:10:33 AM
Creation date
11/22/2007 12:33:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980143
IBM Index Class Name
Revision
Doc Date
4/12/1996
Doc Name
TEXAS CREEK GRAVEL PIT M-80-143 REVISED RECLAMATION ESTIMATE AMOUNT
From
DMG
To
NEILS EXCAVATION
Type & Sequence
RP1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' RECLAMATION COST SUMMARY cont'd <br />~ K. PORTAL/SHAFT SEALING <br />Task No.l Task Description <br />----- I ----`--------------------_' <br />I N/A <br />I <br />I <br />I <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No.l Task Description <br />--------I-------------------------------- <br />I N/A <br />I <br />I <br />I <br /> <br />sheet 4 of 4 <br />I Cost (S) <br />Subtotal (K); <br />I Cost (i) <br />I <br />I <br />I <br />I <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.l Task Description Cost (f) <br />I <br />3 I I <br />DemolitionDispose of 5'x5'x10' mass @ 50.22/c.f. I <br />555 <br />4 I Seeding As per attached worksheet I 51.397 <br />I Fencing N/A I <br />5 I Mob/Demob As per attached worksheet I 5783 <br />Subtotal (M): 52.235 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 56.739 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No. <br />------ l Item Description <br />--------------------------- <br />------ <br />-- Cost (S) <br />---------- <br />1. I <br />Public Liability Insurance.... 1.550% of I <br />dir. I 5104 <br />2. I Contractor's Performance Bond 0.975% of dir. I 566 <br />3. I Contractor's Profit........... 10.00% of dir. I 5674 <br />4. I Job Superintendent..Equip. oper. serves as super.) <br />Subtotal (A): 5844 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 57.583 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.l Item Description Cost (f) <br />--------I-----------------------------------------------I------------ <br />I I <br />1. I Minerals Program Adm 5.OOX of cntr.l 5379 <br />NET INDIRECT COST PERCENTAGE; 18.15% Subtotal (B): f379 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): t1.223 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 57.962 <br />
The URL can be used to link to this page
Your browser does not support the video tag.