Laserfiche WebLink
_~ .. <br />-.. <br />Mr. Steve Renner <br />September 19, 1986 <br />Page Two <br />WFC will commit to seeding within the first recommended seeding season . <br />after topsoiling. <br />7. Erosion practices may include: contour furrowing, establishment of rip-rapped <br />relief ditches and ditches routing runoff to these relief ditches, rock check <br />dams, hay or straw check dams and mulching. <br />8. Establishment of the above erosion practices should reduce maintenance on <br />the site for rills and gullies. However, WFC will commit to an annual <br />inspection for rills and gullies. The annual inspection and repair will be <br />conducted in either June, July, August or September. This is after spring <br />runoff and prior to fall snow storms. <br />Loadout Reclamation <br />1. The Loadout is a 1.3 acre triangularly shaped area with coal fines spread <br />throughout at an average depth of 9 inches. WFC plans to pick up the Loadout <br />material with a front end loader and haul the coal to the pit with dump trucks. <br />[f you have any questions regarding the above, please do not hesitate to contact me. <br />Sincerely, <br />~~~" <br />David M. Stout <br />Environmental Coordinator <br />DMS/tl <br />cc: Steve Magnuson <br />Gienn Murdock <br />