My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV100067
DRMS
>
Back File Migration
>
Revision
>
REV100067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:10:31 AM
Creation date
11/22/2007 12:33:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983175
IBM Index Class Name
Revision
Doc Date
2/20/2001
Doc Name
ALAMOSA PIT 2 PN M-1983-175 ENCLOSED BOND RECALCULATION
From
DMG
To
SOUTHWEST READY-MIX INC
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />PROJECT IDENTIFICATION <br />Agency or orgariizalion name' DMG <br /> <br />7askp: 03a State:CC/orado P¢rmNjobII:f{~-1983d]5 <br />Dale . 0 7//42 0 01 _ County : Alamwa Ahbrevialion :none <br />User: SSS S'ne:Alamosa Plt No.2 Filename:M17S03a <br /> <br />Permit or other job action :Routine Bontl Recalcula]ion <br /> <br />cask descriplinr. : Rip backfilled area and spread topsoil <br /> <br />HOURLY EOUIPMEN7 COST <br /> Basic machine :CAT 16H Horsepower' 275 <br /> Attachment no. 1 : NA Shift basis : 1 per day <br /> Attachment no. 2 : Multi-shank upper <br /> Utilization We Cosl data source : (CRG) <br />Cost Breakdown Ownership cosgheur: E56. 77 NA <br /> Operating cosVhour'. 858,90 100 <br />Ripper op.casOhour : 12.15 <br />Operator costlhour: 127.99 <br />Total unit cosVhour : 1145.81 <br />50 <br />MATERIAL QUANTITIES <br />NA <br />Total Oeet cosVhr: $145.8f <br />Total area br be graded : 13. ]O acres <br />Source of quardiry lake-olf : 1-2B-2000 insp. 13.7 acres remaining to be reclaimed <br />HOURLY PRODUCTION <br />Selected grading activiryAvork level :Heavy gratl/ngrdpping <br />Unadju:•led hourly unit production : 0.59 acres/hr (Cat HB) <br />Job Condition Correction Factors <br />Average site altitude : 7,500 leel <br />Altitude adjustment ladon 1.00 (Gaf HB) <br />Job efficiency adjustment laclor : O.B3 (1 shiNdayJ <br />Nel job correction : O.B3 <br />Adjusted hourly unit production: 0.49 acres/hr <br />Adjusted hourly Meet production : 0.49 acres/hr <br />JOB TIME AND COST <br />Fle¢t size . 1 Grader(s) Total lob lime : 27.98 Hours <br />Unit cost : 1297.75 /acre Total jab cost $4,0]9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.