Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />PROJECT IDENTIFICATION <br />Agency or orgariizalion name' DMG <br /> <br />7askp: 03a State:CC/orado P¢rmNjobII:f{~-1983d]5 <br />Dale . 0 7//42 0 01 _ County : Alamwa Ahbrevialion :none <br />User: SSS S'ne:Alamosa Plt No.2 Filename:M17S03a <br /> <br />Permit or other job action :Routine Bontl Recalcula]ion <br /> <br />cask descriplinr. : Rip backfilled area and spread topsoil <br /> <br />HOURLY EOUIPMEN7 COST <br /> Basic machine :CAT 16H Horsepower' 275 <br /> Attachment no. 1 : NA Shift basis : 1 per day <br /> Attachment no. 2 : Multi-shank upper <br /> Utilization We Cosl data source : (CRG) <br />Cost Breakdown Ownership cosgheur: E56. 77 NA <br /> Operating cosVhour'. 858,90 100 <br />Ripper op.casOhour : 12.15 <br />Operator costlhour: 127.99 <br />Total unit cosVhour : 1145.81 <br />50 <br />MATERIAL QUANTITIES <br />NA <br />Total Oeet cosVhr: $145.8f <br />Total area br be graded : 13. ]O acres <br />Source of quardiry lake-olf : 1-2B-2000 insp. 13.7 acres remaining to be reclaimed <br />HOURLY PRODUCTION <br />Selected grading activiryAvork level :Heavy gratl/ngrdpping <br />Unadju:•led hourly unit production : 0.59 acres/hr (Cat HB) <br />Job Condition Correction Factors <br />Average site altitude : 7,500 leel <br />Altitude adjustment ladon 1.00 (Gaf HB) <br />Job efficiency adjustment laclor : O.B3 (1 shiNdayJ <br />Nel job correction : O.B3 <br />Adjusted hourly unit production: 0.49 acres/hr <br />Adjusted hourly Meet production : 0.49 acres/hr <br />JOB TIME AND COST <br />Fle¢t size . 1 Grader(s) Total lob lime : 27.98 Hours <br />Unit cost : 1297.75 /acre Total jab cost $4,0]9 <br />