My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV100067
DRMS
>
Back File Migration
>
Revision
>
REV100067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:10:31 AM
Creation date
11/22/2007 12:33:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983175
IBM Index Class Name
Revision
Doc Date
2/20/2001
Doc Name
ALAMOSA PIT 2 PN M-1983-175 ENCLOSED BOND RECALCULATION
From
DMG
To
SOUTHWEST READY-MIX INC
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />TRUCKILOADER TEAM WORK <br />Agency or organization name : DMG <br />Task # 02a State :Colorado <br />Date : 02/142001 County : A>amosa <br />User . SSS Site Alamosa Pit <br />• sheet t or 2 <br />2 <br />PermiVjob # . M-1983.175 <br />Abbreviation :none <br />F~dename : M77S02a <br />Permit or other job action :Routine Bond Recalculahon <br />Task description :Import and p/ace topsoil over east 13 acres o(pit <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Truck/loader team -Truck :Genenc 72-18 cy, 6x4 <br />-Loatler ~ CAT 966E S.2 std. Ii1t (1999) <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : 'CrucklLoader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : tmck2 loader NA NA NA NA <br />% Utilization-machine : 100 99 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cosUhour: $20,72 830.78 NA NA NA NA <br />Operating cosVhour : $26.72 $30.62 NA NA NA NA <br />Ripper op. cosVhour : NA NA NA NA NA NA <br />Operator cosVhour : 523.61 $27.99 NA NA NA NA <br />Unit subtotals' 810.45 889.39 NA NA NA NA <br />Number of units : 72 1 0 0 0 0 <br />Group subtotals: Work: 5934.80 Support: 80.00 Maintenance: 80.00 <br />Total work team cosUhour : $934.80 <br />MATERIAL QUANTITIES <br />Initial <br />volume: 8,000 LCY <br />Swell Loose <br />lactor : NA volume ~ 8,000 LCY <br />Source of quantity take-off : 1-28-2000 inspection 13.7 acres cov'd w/6' <br />Source of estimated swell factor : NA <br />Material purchase cost : 812.00 /LCY Total cost . <br />- s~-. <br />-_.-- ... $96,000 <br />. <br />.. J6r 'r r... ... .. . -. .. .... .__ .. _.. ... <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : <br />2,100 pounds/LCY Struck volume : 12.00 LCY <br />_ <br />Descr. ~ Earth -loam Heaped volume : 18.00 LCY <br />~ <br />Rated payload t_48,000 pounds Average volume : 15.00 LCY <br />- <br />Payload capacity : 22.86 LCY Adjusted capacity . 15.00 LCY <br />Final adjusted truck capacity based on~spec ifc number of loader passes : 14.18 LCY <br />Loading Tool Capacity <br />Rated capacity (nom. heaped) <br />Descr.:Other-moist loam (100- <br />Bucket fill factor <br />Adjusted bucket capacity <br />4.500 LCY <br />1.050 <br />4.725 LCY <br />Truck <br />Altitude adl 1.000 <br />Job efficiency : 0.830 <br />Net correction : 0.830 <br />Site altitude (ft.) : 7,500 <br />Loader ~ Source <br />1.000 ~ (Cat HB) <br />0 830 (1 shiR/day, <br />0.830 ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.