Laserfiche WebLink
v <br />i <br />2. No response required. <br />4. The 48" drop outlet structure for MB-3, per drawing G-103 is 10 feet high. MCC added a <br />nominal 5 feet for any length that may be set into the ground or up under the footbridge. <br />No other 48" culvert is proposed for MB-3. Pond MB-2R will utilize approximately 340 <br />feet of 48" culvert. <br />6. No response required. <br />8. The sediment trap and total job costs have been revised. <br />Miscellaneous Page Chances <br />1. No response required. <br />2. No response required. <br />Page 2.05-19 has been revised correcting the storage water rights for MB-2' and MB-3. Please <br />contact me as soon as possible should you have further questions. <br />Sincerely, <br />~~1. ~.~- <br />Kathleen G. Welt <br />Environmental Supervisor <br />KG W/mer <br />