Laserfiche WebLink
ss <br />~tn C,61`l~pl~~ <br /> STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY / <br />Department of Natural Resources <br />t 313 Sherman St., Room 215 C O L D RA D ~ <br />Denver, Colorado 80203 DIVISION O F <br />Phone: (303) 866-3567 l~l I N & A L $ <br />FAX: (303) 832106 <br />GEOLOGY <br /> REC LAMATION•MINWO <br /> SAFETY•SC IENCE <br /> gill Owens <br />September 29, 2003 governor <br /> Greg E. Walther <br />MI. Henry A. 5'Cilulel Executive Director <br />SC11uleC TeITaCmg~ Ronald W. Cattany <br />510 CaribOLL St. Division Director <br />P.O. Box 398 Natual Resource Trustee <br />Simla, CO 80835 <br /> <br />Re: Simla Highway Pit, Permit No. M-1995-095, Recut of 110 Construction Materials Reclamation <br />Permit Amendment Application Package, AM -1 <br />Dear Mr. Schuler: <br />On September 29, 2003, the Division of Minerals and Geology received your the 110 Construction Materials <br />Reclamation Permit Amendment Application package for the Simla Highway Pit, Permit No. M-1995-095. <br />Preliminary review of the informafion received determiried that the following items must be received before the <br />Division can consider your application as being submitted and technical review can begin: <br />APPi.TCATTnN FORMe Page 2, Item 6 and 7: Needs completing. Page 2, Item 9: Needs <br />completing. Page 2, Item 11: Needs completing. <br />F.XATRiT P _ Reclamation Plan (Role 6.3.41: (1) The purpose of the Reclamation Plan is to <br />describe the timing, procedures, criteria and materials that will be used to reclaim the affected land to <br />the proposed future land use. This plan must be correlated to Exhibit E -Map. The description of the <br />Reclarnafion Plan must be adequate to safisfy the requirements of Section 3.1 and demonstrate <br />compliance with Rule 3. At a minimum, the Application shall include the following information: <br />(f) All Limited impact 110 applications must provide an estimate of the actual costs to <br />reclaim the site based on what it would cost the state using an independent contractor to complete <br />reclamation. include the unit costs for the following activities as appropriate to the operation: <br />backfilling, grading, topsoil application, seedmg, mulching, fertilization, and labor to complete <br />reclamation. Determine and specify the point during the operation when the site has reached a point of <br />maximum disturbance. The cost to reclaim the site to the specifications of the Reclamation Plan at this <br />point must be estimated. Unit costs (cost per cubic yazd), volumes, haul or push distances, and grades <br />must be included when backfilling and grading is part of the Reclamation Plan. Volume and unit costs <br />for finish grading, subsoil and topsoil application must be provided in terms of cost per cubic yard. The <br />estimated cost for fertilizer, seed and mulch acquisition and application must be provided as cost per <br />acre. <br />(2) Equipment costs must include such factors as equipment operator wages and benefits, fuel and <br />Office of Office of Colorado <br />Mined Land Reclamation Active and Inactive Mines Geological Survey <br />