Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />STATF OF COLvi~~v <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparlmenl of Natural Resources <br />1717 Sherman St., Room 215 <br />Denvcr, Colorado 80203 <br />Phone: (303) 866-3567 <br />FA%:(7031832-8106 APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be completed and submitted with all requests for minor revisions, as defined in <br />Rule 1.041731, technical revisions, as defined in Rule 1.0411361, and permit revisions, as defined <br />in Rule 1.04(901. All revisions are to address the requirements of Rule 2.08.4. Three 13) copies <br />of the revision, including maps, must be submitted in order for it to be complete. <br />DEPARTMEM' OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames 5. Lochhead <br />Exetuuve Director <br />Michael 8. Long <br />Division Dire<ior <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised <br />sections, maps, tables and/or figures, with a revised table of contents, if necessary. The revision <br />submittal date should be printed in the lower right corner of each revision page. A cover letter to the <br />revision should explain the nature of the revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing <br />list at the same time the application is submitted to the Division, and proof of distribution must be submitted <br />to the Division along with the application. Copies of revision pages modified during the review process must <br />be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. For non-federal mines, a copy of the application for which the <br />Division has issued a proposed approval decision must be submitted to the OSM Albuquerque Field Office <br />(AFO), and proof of submittal to AFO must be submitted to the Division prior to implementation of the <br />revision. <br />Permit No.: C- a ~- ~ ~? Date: 1 0/ 0 4/~ "~ <br />Permittee: 0 h i o- C r e e k- C o~ a 1 -. ~R,4a,~ <br /> <br />'1 <br />i <br />n e - <br />- <br />_ <br />-- ' ;cr- <br /> <br />- - - - - - f~~~~IVED ~~, -. <br />Street: 2 0 ~ 4- C o u n t y__ <br />-- OCT d f~ 1995 <br />R o a d 7 3 0 <br />City: G u n n i s <br />- o <br />- n <br />- - <br />- - - - - ~ivician at Id+nalPlc & Gsa!e9Y <br />State: ~ ~ Zip Code: 8 1 2 ~ 0 - - - - - <br />Brief Description of R evision: a r~adi~ and h~drolo~ic control plan <br />Public Notice Attached: Yes X No - /Required for PRs and TRsI <br />Bond Increase: Yes No X Federal X Non-Federal Mine <br />Proposed Change in: <br />Disturbed Area (+/-) 0 0 0 O goes Affected Area (+/-) 0 0 <br />Permit Area (+/-) 0 0 0 0 Acres Federal Land (+/-1 0 0 <br />State Land (+/-) 0 0 0 0 Acres Private Land (+/-) 0 0 <br />0 , 0 Acres <br />0 0 Acres <br />0 0 goes <br />m:lcoel\shara\(o rms\8865 <br />