My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99833
DRMS
>
Back File Migration
>
Revision
>
REV99833
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:39 AM
Creation date
11/22/2007 12:31:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Revision
Doc Date
7/19/1993
From
PITTSBURG & MIDWAY COAL MINING CO
To
DMG
Type & Sequence
TR24
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W. s <br />1313 Sherman St. <br />Room 215 <br />Denver, CO 80203-2273 <br />The Pittsburg & Midway Coal Mining Co. <br />A Chevron Company <br />Edna Mine <br />P.O. Box 176, Oak Creek, CO 80467 <br />(303)736-8111 <br />Ms. Susan Morrison <br />CDMG <br />Dear Ms. Morrison, <br />III IIIIIIIIIIIIIIII <br />RECEIVEC <br />JUL 191993 <br />Division of Minerals a veuluyy <br />July 15, 1993 <br />As per our conversation this date, this letter will serve as a <br />written request for extensions on decision dates for 4 Technical <br />Revisions currently before the Divison of Minerals and Geology. <br />The Revision numbers are 20, 23, 24 and 25. <br />T.R. 20 was submitted as part of the Edna Mine permit renewal <br />process. The current decision date on this T.R. is 8/4/93. An <br />extension is needed on this decision to allow further study of <br />this issue. An extension of 30 days is requested for this <br />decision to 9/4/93. <br />T.R. 23 was submitted as part of the abatement process for N.O.V. <br />C-93-025. An extension has been granted on this abatement period <br />to September 2, 1993. The current decision date on this T.R. is <br />7/18/93. The extension on this decision date is needed to allow <br />the Division adequate time to review the submitted design. A 30 <br />day extension is requested to 8/18/93. <br />T.R. 24 was submitted as part of the abatement for N.O.V. C-93- <br />024. The Division has communicated concerns to P&M about certain <br />designs turned in as part of this Revision. The current deadline <br />for this T.R. is 7/18/93. The extension is needed to allow time <br />for P&M staff to adequately address the Division's concerns, and <br />to allow the Division to review the material. An extension to <br />8/23/93 is requested in this case. <br />abatement for N.O.V. C-93- <br />decision is 7/26/93. An <br />allow the Division adequate <br />'signs. P&M will also be <br />remove one ditch that was <br />design. An extension of 20 <br />days is requested in this case to 8/15/93. <br />T.R. 25 was submitted as part of the <br />025. The current deadline for a <br />extension is needed for this date to <br />time for review of the submitted d <br />revising this revision slightly to <br />erroneously included in the drainage <br />
The URL can be used to link to this page
Your browser does not support the video tag.