My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99756
DRMS
>
Back File Migration
>
Revision
>
REV99756
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:36 AM
Creation date
11/22/2007 12:30:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Revision
Doc Date
2/8/1988
Doc Name
RECONSTRUCTION OF PRIME FARMLAND SOILS @ SNOWMASS LOADOUT
From
MLRD
To
BOB L
Type & Sequence
SL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZATION/DEMOBILIZATION ESTIP <br />TASK N0. /0 DATE d - S -8b PREPARED BY LR w PERMIT N0. <br />PERMIT ACTION R2c unslroc ~~en ~f •~frl se,/- <br />0 Snr. w.:ia .fd Lr,.~aa ~'/ <br />HOURLY EQUIPMENT & HAUL UNIT COSTS <br />Equipment Transport Rigs: Labor Zone / a <br />Light Equipment Rig (for equipment weighing up to 3 <br />Ownership cost/hr $ 33, rs + operating cost/hr $ <br />+ helper cost/hr $ /y. sx~ _ $ S9. ?7 /hr Total <br />Heavy Equipment Rig (for equipment weighing over 35 <br />Ownership cost/hr $ ss.ia + operating cost/hr $ <br />+ helper cost/hr $ 1y.S"B = $ la4.as /hr Total <br />Equipment Used on Job: <br />i tons GUW): <br />ip, 6G + driver cost/hr $ as.rp <br />Rig Cost <br />tons GVW): <br />.?i.97 + driver cost/hr $ aa.sf~ <br />Rig Cost <br />Machine Equip. Ownership Equip. Haul Rig Fleet Size Mob./Demob. <br />Description Cost/hr Cost/hr (no. hauled) Cost/hr <br />81s a $ ac.vy + $ P9~J7 x = $ 17G.J1 <br />to c y D~„N. 7 ~~~ $ so . ~a + $ - x = $ so. 7a <br />953 $ 6o.Jy + $ 59,37 x = $ 149.1 <br />p8L $ 107.19 + $ 1ay.aS x = $ ~31.Uy <br />G,37 D $ 185.&~/ + $ 12N,a.S' x oZ = $ (..a0, l~' <br />IN G- $ 73.33 + $ t'9,?7 x = $ 16a,71> <br /> $ + $ x = S <br /> $ + $ x = $ <br /> $ + $ x = $ <br /> $ + $ x = $ <br /> $ + $ x = $ <br /> $ + $ x = $ <br />Total Project Mob./Demob. Cost/hr = $ /3 9/. O G <br />EQUIPMENT HAUL DISTANCE & TIME <br />Major population center within project area region G len w,oc/ S~~s <br />Total distance = 15 miles, average speed in miles per hour = ~/0 <br />Job time: G,~S hrs load + 0,•3 hrs haul + o.•~S hrs unload + 0.,~ hrs return <br />= 1,/ total hrs x 2 trips = 0?.2, hours total mob./demob. time <br />JOB COST <br />a,a hrs x $ /,~9/,~6 = $ 3 060.3? Total Job Cost <br />Total mob./demob. time Total project mob./ <br />demob. cost/hr <br />NOTE: Depending on the job layout and reclamation requirements, it may be necessary to <br />mobilize/demobilize additional equipment at some future point in time after com- <br />pletion of initial reclamation work to perform sediment pond/diversion ditch final <br />reclamation and any necessary reseeding work due to initial seeding failures. <br />Costs for transporting appropriate equipment to and from the job site to perform <br />such follow-up work should be included in the mob./demob. estimate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.