My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99737
DRMS
>
Back File Migration
>
Revision
>
REV99737
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:35 AM
Creation date
11/22/2007 12:30:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
5/6/1991
Doc Name
TR 91-12 PN C-81-038
From
CYPRUS ORCHARD VALLEY
To
MLRD
Type & Sequence
TR12
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />999 <br />C c~rpRUs <br />'r'? Orchard Valley <br />Cyprus Orchard Valley Mine <br />P. O. Box 1299 <br />Paonia, CO 81428 <br />Phone: 303-527-4135 <br />Fax: 303-527-2234 <br />May 3, 1991 <br />Carl Mount, Reclamation Specialist <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203-2273 <br />Dear Mr. Mount: <br /> <br />MAY 6 1991 <br />Pvlined Land <br />Reclamation Division <br />RE: Technical Revision No.91-12; Permit Number C-81-038 <br />As per our discussion, I have attached permit pages 2.05-1 through 2.05-11. These pages <br />replace existing pages 1 through 15 in the current permit. Pages 2.05-12 through 2.05-12 have <br />been identified as being left intentionally blank. I believe this will correct the problem of being <br />able to incorporate the revised pages into the permit document. Also, I have attached a revised <br />copy of Map 2-5 for insertion into the technical revision application. <br />In reference to access into panels AA and AB the technical revision pages have been revised to <br />reflect that COV will be obtaining a lease from the BLM for this coal. Once this occurs an <br />application will be submitted to the appropriate regulatory authorities for approval to mine in <br />the new lease, and this application will show access into panels AA and AB. In the event that <br />the lease is not secured COV will submit a minor revision to the permit showing an access <br />corridor into panels AA and AB. <br />It should be noted that COV will be submitting a response to the concerns and questions raised <br />by the BLM during their review of the application. COV's responses to these concerns and <br />questions will be submitted under separate cover. It is anticipated that the responses will be <br />submitted to the BLM within the next 7 to 10 ten days. I would imagine the BLM will require <br />at least 4 weeks to conduct their review, and coordinate same with the OSM. <br />
The URL can be used to link to this page
Your browser does not support the video tag.