My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-09-10_REVISION - M1977247 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977247
>
1997-09-10_REVISION - M1977247 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 8:14:16 AM
Creation date
11/22/2007 12:30:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977247
IBM Index Class Name
REVISION
Doc Date
9/10/1997
Doc Name
AMENDMENT APPLICATION AND EXHIBITS
From
GP-Gypsum
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXI-IIBIT L -- Reclamation Costs--These cost projections, also Visted in the Reclamation Plan <br />Exhibit, are given as related to the various tasks anticipated in be performed during closure <br />work. <br />SUMMARY OF CLOSURE COSTS BY AREA AND TYPE OF WORK TO BE PERFORMED <br />Area and task Blasting tonnage Dozer tonnage Est cost <br />Gold Hill Veneer Rmvl 21000 40000 "~ <br />Gold Hill mine bench rmvl 46500 5000 27500/ <br />Gold HilllSenatore Hill <br />highwall removal 95400 12000 101400 ~ (,`~~ <br />Gold Hill/Copper Hill <br />south aspect highwall nnvl 20800 3000 22300 <br />Zinc Hill highwall south of <br />crusher site 25400 1000 25900 <br />Senatore Hill/hangingwall <br />contact highwall 36500 2500 37750 <br />Copper Hill highwall 337000 25000 225000 <br /> <br />Hangingwall waste 34000 <br />84000 / <br />76000 v <br />Titanium Hill-South End 10000 25000 22500 /• <br />Roadway removals, buildings, <br />stationary and mobile equip. <br />Removal cost 50000 <br />Final Stormwater Management <br />structure construction 45000 <br />Revegetation costs over five years <br />sitewide maintenance/completion 90000E ~ 45~17U <br />Haul 12"-18" topsoil to 24 acres of <br />flat areas and revegetation costs 67200 - s ~~ <br />TOTALS 605000 157500 $830,550.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.