Laserfiche WebLink
<br />EXI-IIBIT L -- Reclamation Costs--These cost projections, also Visted in the Reclamation Plan <br />Exhibit, are given as related to the various tasks anticipated in be performed during closure <br />work. <br />SUMMARY OF CLOSURE COSTS BY AREA AND TYPE OF WORK TO BE PERFORMED <br />Area and task Blasting tonnage Dozer tonnage Est cost <br />Gold Hill Veneer Rmvl 21000 40000 "~ <br />Gold Hill mine bench rmvl 46500 5000 27500/ <br />Gold HilllSenatore Hill <br />highwall removal 95400 12000 101400 ~ (,`~~ <br />Gold Hill/Copper Hill <br />south aspect highwall nnvl 20800 3000 22300 <br />Zinc Hill highwall south of <br />crusher site 25400 1000 25900 <br />Senatore Hill/hangingwall <br />contact highwall 36500 2500 37750 <br />Copper Hill highwall 337000 25000 225000 <br /> <br />Hangingwall waste 34000 <br />84000 / <br />76000 v <br />Titanium Hill-South End 10000 25000 22500 /• <br />Roadway removals, buildings, <br />stationary and mobile equip. <br />Removal cost 50000 <br />Final Stormwater Management <br />structure construction 45000 <br />Revegetation costs over five years <br />sitewide maintenance/completion 90000E ~ 45~17U <br />Haul 12"-18" topsoil to 24 acres of <br />flat areas and revegetation costs 67200 - s ~~ <br />TOTALS 605000 157500 $830,550.00 <br />