Laserfiche WebLink
<br />Section 2000 18800 tons <br />Section 2100 16800 tons <br />Total Tonnage 95400 tons <br />GOLD HII.LICOPPER HILL CONTACT HIGHWALL <br /> <br />Also along this same line of direction but further north along these sections, a highwall face <br />exists on the South aspect of Copper Hill, accessible from the Gold Hill 6935' working level: <br />Section 2200 3400 tons <br />Section 2300 4000 tons <br />Section 2400 4400 tons <br />Section 2500 4000 tons <br />Section 2600 5000 tons <br />Total Tonnage 20800 tons <br />The Copper Hill Southern aspect volumes will also need to be drilled, blasted, and bulldozed to <br />result in a rock talus slope of l:l. <br />ZINC HILL/#1 BED CONTACT HIGHWALL <br />Mine development from the crusher bin northwest along the main haul road resulting in a .25:1 <br />highwall contact which must be reduced to a 1:1 slope based on closure criteria. This highwall <br />removal would include the haul road accessing Gold Hill from the crusher site and would affect <br />700 feet of highwall northwest starting from the area of the truck tum around at the crusher bin <br />dump point. <br />Section 600 3000 tons <br />Section 700 3800 tons <br />Section 800 4200 tons <br />Section 900 5000 tons <br />Section 1000 5600 tons <br />Section 1100 6800 tons <br />Section 1200 7000 tons <br />Total tonnage 35400 tons <br />