My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99693
DRMS
>
Back File Migration
>
Revision
>
REV99693
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:32 AM
Creation date
11/22/2007 12:29:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980170
IBM Index Class Name
Revision
Doc Date
3/25/1981
Doc Name
REQUEST FOR TRANSFER OF MINERAL PERMIT & SUCCESSION OF OPERATORS
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• STATE <br />Roy Romer, Governor <br />DEPARTMENT OF NATURAL RESOURCES <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Dlnetor <br />LIMITED IMPACT OPERATION (110} <br />APPLICATION PACKAGE <br />Applicability <br />RADO <br />This package applies to a mining operation which affects less than 10 acres <br />and extracts less than 70,000 tons of mineral and/or overburden per calendar <br />year. If you plan to conduct a mining operation which satisfies these <br />criteria, then you should follow the instructions provided in this package for <br />filing an application. <br />Filing Requirements <br />You should obtain the Mineral <br />(E2.00/copy) and read Rules 3 <br />Permit for a limited impact oG <br />Operation (110) Application F~ <br />be submitted to the Division. <br />instructions for preparing in <br />Application Review Procedure <br />Upon receipt of the applicat <br />Division will review them an <br />the minimum information requ <br />of the Mineral Rules and Rec <br />information, then it will bi <br />to proceed with the notific <br />does not contain the minima <br />information required to mak <br />n.,1os-and_Regulations from the Division <br />--- - ~=^~n~ and Reclamation <br />i Impact <br />0(S) ~IIOI ~~ tion fee must <br />~~d ` .ion form and <br />try, ~ A-G. <br />r'YOGZ$ 5'hr <br />ee, the <br />h~rmu*6r,, ~ py/// ~ they contai n <br />~~` ~":`'' pWs. act and Rule 3 <br />~rra~r,al Wava.,~{rs ova ~ r,, , i ns thi s <br />\ ( f ~rcr . 1 be notified <br />~h~k e application <br />Q '" fied of the <br />..~., <br />Your application will be scheduled for consideration by the m,ned Land <br />Reclamation Boa rd 'within 30 days after it is deemed "complete". You will be <br />notified of the date when the Board will consider your application. The Board <br />will decide whether all of the applicable information and notice requirements <br />of the Act and Regulations have been satisfied and whether the criteria in <br />Sections 115 and 120 of the Act apply. You wi1T-6e notified of the Board's <br />decision concerning the application. <br />Please note, additional information may need to be added to the application <br />after a "complete" determination in order to satisfy the applicable <br />requirements of the Mined Land Reclamation Act and the Mineral Rules and <br />Regulations. The Division will notify you of any additional information <br />requirements within the 30 day processing period. <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203-2273 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.