My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99667
DRMS
>
Back File Migration
>
Revision
>
REV99667
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:31 AM
Creation date
11/22/2007 12:29:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
5/10/1996
Doc Name
TR 39 DESERADO MINE FN C-81-018
From
DMG
To
WESTERN FUELS UTAH INC
Type & Sequence
TR39
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depatlmenl of Nalu r, I Resources I~~~~ <br />1313 Sherman 51., Room 215 <br />Denver, Colorado 80203 <br />Phone: 11011 866-3 56 7 <br />FA% 1J031832~8106 <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />May 10, 1996 <br />Mr. Murari Shresth.a, P.E. <br />Western Fuels-Utah., Inc. <br />Suite 1/305 <br />405 Urban Street <br />Lakewood, Colorado <br />RE: Technical Revision No <br />File No. C-81-018 <br />Dear Mr. Shrestha: <br />39, Deserado Mine <br />Ruy Romer <br />Govema <br />lames 5. Lochhead <br />Execm me Dveao~ <br />michael B Lung <br />Div is ion Di~ec loi <br />The Division has conducted a preliminary review of the above <br />referenced T.R. application, and, as you know, Susan Burgmaier and <br />I recently conducted an inspection focusing specifically on <br />sediment and drainage control at the refuse disposal areas, which <br />is the subject of the revision. Susan is a surface water <br />hydrologist, and she identified a number of concerns with respect <br />to design and implementation of drainage stabilization and sediment <br />control structure:> at the site, as addressed in her inspection <br />report dated May 3, 1996. <br />Specific concerns and recommendations based on review of the <br />revision application and relevant sections of the current permit <br />application package, as well as the site inspection, are set forth <br />in the enclosure. In general, the concerns can be organized into <br />interim stabilization issues, and permanent design issues. <br />Interim stabilization issues concern measures which need to be <br />taken during the period of waste pile construction to control <br />channel erosion, minimize sediment delivery to the sediment pond, <br />and ensure the prosper functioning of the drainage/sediment control <br />system during the construction phase. Interim measures could <br />include a variety of practices, including initiation of final <br />reclamation (cover and topsoil placement and seeding) as soon as <br />practicable, use ~of diversion ditches on long refuse slopes to <br />minimize rill and gully erosion on the slopes, use of temporary <br />check dams and dugout sediment traps to slow flow velocities and <br />trap sediment, use of riprap on erosive segments of temporary <br />ditches, spillways, pond inlets, ditch junctions, etc, and use of <br />appropriate chemical flocculant to minimize settling time in the <br />sediment ponds. <br />
The URL can be used to link to this page
Your browser does not support the video tag.