My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99663
DRMS
>
Back File Migration
>
Revision
>
REV99663
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:31 AM
Creation date
11/22/2007 12:29:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977020
IBM Index Class Name
Revision
Doc Date
11/13/1997
Doc Name
DELTA SAND GRAVEL CO PIT 1 MLRB PN M-77-020 THIRD ADEQUACY LETTER
From
ENVIRONMENT INC
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit L - Reclamation Costs (revised ~~-t3-e~~ <br />This Reclamation Cost estimate is based on having a maximum area <br />of disturbance consisting of no more than 15.00 acres ±, needing some <br />form of reclamation at any one time. This includes areas stripped, <br />partially mined and partially reclaimed. Lake surface area and roads <br />do not need reclamation. The table below outlines the baseline data <br />we used to do our bond estimate calculations. Map Exhibit L-1 shows <br />the site at a time when we believe the site disturbance is at a <br />maximum. This is when approximately 508 of the EAST PARCEL is <br />stripped and mined. The west lake area will only have a 1.00 acres <br />area in the southwest corner that needs to be resoiled and <br />revegetated. <br />DESCRIPTION TOTALS <br />AREA NEEDING REVEGETATION 15.00 ac. <br />WEST LAKE AREA 12.40 ac. <br />EAST LAKE DEWATER AREA 3.84 ac. <br />NEEDS REBOILING 8.50 nc. (depth 7") <br />UN-SHAPED SLOPES (east lake) 1,100 lin ear feet <br />UN-SHAPED SLOPES (west lake) 800 lin ear feet <br />BACKFILL VOLUME (east lake) 8,578 cy (6,974 with 1.23 swell factor) <br />BACKFILL VOLUME (west lake) 1,476 cy (1,200 with 1.23 swell factor) <br />REBOILING VOLUME 8,919 cy (7,999 with 1.12 swell factor) <br />SLOPE FILL VOLUME (east lake) 6.00 cy/lf <br />SLOPE FZLL VOLUME (west lake) 1.SD cy/lf <br />ESTIMATED UNIT COSTS FOR RECLAMATION ITEMS: <br />Unit Cost <br />1. Revegetation activities and coats $ 500.00/AC. <br />(includes grass seed, fertilizer, mulch and general labor costs) <br />2. Revegetation activities and costs @ 408 $ 200.00/AC. <br />(includes grass seed, and general labor costs) <br />3. Re-spreading soil and/or growth media with 631-D scraper, <br />Haul distance less than 500' $ 0.4o5/YD3 1/ <br />4. Backfilling and shaping slopes using a D-9 dozer, push <br />distance less than 75 ft $ 0.122/YD3 2/ <br />5. De-watering pump operation (see next page) $ 264.57/day 3/ <br />RECLAMATION COSTS <br />1. Revegetation costs - 15.00/ac @ $500.00/acre $ 7,500.00 <br />2. Reseeding costs - 15.00/ac @ $200.00/acre $ 3,000.00 <br />2. Resoiling - 8,919 YD3 x 40.St/YD3 3,608.45 <br />3. Backfilling and shaping - 10,054.5 YD3 x 12.20/YD3 1,229.18 <br />4. De-watering pump operation - 17 days @ $247.76/day 4,212.00 <br />Net Total $ 19,549.63 <br />4. indirect costs <br />Mobilization 1,183.00 <br />Insurance, Bond, b Profit 2,448.59 <br />5. Administration costs 1 954.96 <br />TOTAL ESTIMATE 25,136.78 <br />BOND BE SET AT 525,100.00 <br />1 / Figured us/ng Ca Handbook and usual eosls jrom lad sources for 83% r,(/akncy aid a D-9 vaek dozer, for Uu was! slope. <br />2 / Figured using Ca! Handbook old rrnld coals from locd soarers for 83% rf)7ckncy aid a 631D molar scraper, for We was! slope. <br />3 / See pumpLtg cos! ana/ysCs on nes! page. <br />(Revised November 13 1997) <br />
The URL can be used to link to this page
Your browser does not support the video tag.