My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99652
DRMS
>
Back File Migration
>
Revision
>
REV99652
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:30 AM
Creation date
11/22/2007 12:29:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980246
IBM Index Class Name
Revision
Doc Date
8/4/1995
Doc Name
RECLAMATION COST SUMMARY FORM
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and Geology <br />ESTIMATING FORM - BULLDOZER WORK <br />Task #: 16 Prep. by: TDG Task File Name: N246.1b <br />Date: 08/04/95 Permit #:M-80.246 Mine: Zellitti Pit <br />Permit Action: Conversion application <br />Task Description: Regrade pit floor remaining in orig. 9.5 acre site <br />HOURLY EQUIPMENT COST <br /> Basic Machine: Cat DBN Horsepower: 285 <br /> Blade Type: SEMI-UNIVERSAL ----- <br /> Attac hment #1: ROPS Cab Shift Basis: 1/day <br /> Attac hment #2: 3-shank ripper - <br />Cost Breakdown: <br />---------- Utilization X <br />Ownership cost/hr = f46.40 N/A <br />Operating 8 overhaul cost/h r- dozer = 551.67 100 <br /> -ripper = 53.34 50 <br />Operator cost/hr = 122.95 N/A <br />Total egpt. unit cost/hr = 5124.36 Total fleet cost/hr: f124.36 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 12.907.0 L CY Factor: N/A Volume: 12.907.0 LLY <br />Source of quantity ta ke-off: Assume 1 ac.ft./acre over 8.0 acre area <br />Source of est. swell factor: NA <br />HOURLY PRODUCTION <br /> Job Condition Correction Factors <br />Av <br />ush di <br />n <br />t 50 ft -- <br />g. p <br />s <br />a <br />ce: . --- ---- <br /> --- Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 0.90 (Cat tbl) <br />dozer production: 1180 LCY/hr Dozing method..... 1.00 (gen.) <br /> - Visibility........ 1.00 (avg.) <br />Haterial consistency: Job efficiency.... 0.83 (lsh/day) <br />Compacted fill or embankment Spoil pile factor. 0.70 (fnd-mf) <br /> ---- ------ Push gradient..... 1.00 (Cat tbl) <br />Avg. push gradient: 0.00 X (pos) Altitude deration. 1.00 (Cat tbl) <br /> --- Material weight... 0.19 (Cat tbl) <br />Avg. site altitude: 6500 ft. Blade type........ 1.00 (s.SU.U) <br />Material weight 2900.00 lb/LCY Net Job Correction 0.31 <br />Mat. Descr.: -- <br />Decomposed rock - 50X Rock, 50X Earth Adjusted Unit Prod.: 366.73 LCY/hr <br /> Adjusted Fleet Production: 366.73 LCY/hr <br />JOB COST <br />Fleet size 1 Dozers) Total Job Time: 35.19 Hours <br />Unit Cost f0.339 /LCY Total Job Cost: 54.316.88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.