Laserfiche WebLink
Exhibit F -Reclamation Plan and Minin¢ Time Table <br />The mining of the operation currently flows from the south west azea of the property <br />towazds the east north east direction. With the addition of the second mining area two <br />directions of flow will exist. The one listed above and the second flowing from the east <br />to the west. These two azeas will continue to be mined in these directions with an <br />expected completion time azound the year 2020 if used for range land and sooner if <br />developed into water storage facilities. <br />Reclamation will start respectively in two sepazate areas with a focus on the south <br />westerly comer of the property in 2004. This will repair the high wall created be the <br />previous owners and start to get some type of form back to the property. As the mining <br />continues from this point forwazd from both directions the proper slope will be <br />maintained in order to ease reclamation processes throughout the time tables. <br />