My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99632
DRMS
>
Back File Migration
>
Revision
>
REV99632
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:29 AM
Creation date
11/22/2007 12:28:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Revision
Doc Date
3/14/2006
Doc Name
Adequacy Review Letter/Cost Estimate
From
DMG
To
Seneca Coal Company
Type & Sequence
PR5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 048 <br />Date : 03/1 [/2008 <br />User : JRS <br />State :Colorado <br />County : Rout[ <br />Site :Seneca IFW <br />PenniUjobAr : C-1982-057 <br />Abbreviation :none <br />Filename : C057-046 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewal 04 <br />Task description : Bac~ll and Re4ratia f0 Stocktanks <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 48.880 CCY <br />Basic machine : Cat D11 R - 11 U Horsepower : 850 <br />Blade type :Universe[ <br />Attachment no. 1 : ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Ownership cosUhour ; $111.01 NA <br />Opereting cosUhour : $188.40 100 <br />Ripper op.cosUhour: $0.00 0 <br />Operetor cosf/hour: $31.78 NA <br />Total unit cosUhour : 5331.19 Total Beet cost/hour : $1,324.77 <br /> <br /> <br />Swell Loose <br />factor: 1.125 volume: $2,740 LCY <br />Source of estimated volume :Division Esbinate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Averege push distance : 100 fast <br />Unadjusted howdy produc0on : 2,870.3 LCYthr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (1 <br />Average site altitude : 7, 500 feet <br />Material weight : 2, 650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Ysibility : 1.00 <br />Job affrdency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.39 <br />Adjusted unit production : 1118.15 <br />tdjusted fleet production : 4,484.6' <br />LCY/hr <br />Lcrmr <br />Fleet size : 4 Dozers) Total job time : 11.81 Hours <br />Unit cost : $0.297 [LCY Total job cost : $15,849 <br />
The URL can be used to link to this page
Your browser does not support the video tag.