Laserfiche WebLink
Mr. Byron Walker <br />Response to Technical Adequacy letter for MR-57 <br />June 18, 2002 <br />Page 2 <br />Item 6. Agree. Revised page 2.05-16 now includes a reference to the description list of facilities <br />under Facilities Removal Costs provided in Exhibit 13 Appendix D (pages D-18 through D-22). <br />Item 7. Agree. The Table of Contents Pages xiv and xv have title lines reading "LIST OF <br />MAPS/DRAWINGS. <br />Item 8. The "PAGE LEFT INTENTIONALLY BLANK" replaces page 7 in the current PAP. This <br />information can be found on page 2.05-12 and will now contain both historical coal shipped <br />(sold) rates and anticipated coal shipped (sold) rates. <br />Item 9. Agree. Please replace Map 22 with Maps 22A and 22B. <br />Item 10. Agree. Revised pages 2.05-3 and 2.05-4, 2.05-24 through 2.05-27, 4.06-1, 4.06-2, and <br />proposed page 4.06-3 are included in this response. <br />Item 11. Agree. Maps 28A and 28B do replace the existing Map 28. The Index of Changes has <br />been modified to reflect this. The "LIST OF MAPS/DRAWINGS "has been updated to reflect <br />this change. <br />Item 12. Page 2.05-41 of the PAP has been changed to include the topsoil variances in Section <br />10. Two topsoil variances in Section 10 are demarcated on Map 286 and if approved, will be <br />carried forward into the 2002 Annual Report Map. The December 14, 2001 request for a WHIP <br />topsoil variance of 6" for 4 acres has been modified to a 21 acre 6" shrub-only plot using the <br />seed mix found in Table 8 of the PAP. Map 28 B has been revised to contain all the topsoil <br />laydown variances granted (Section 11) and pending (Section 10) to Colowyo. The Index of <br />Changes has been modified to reflect this change. <br />Please feel free to contact me with any questions or concerns you may have. I look forward to <br />working with you on this Minor Revision-57. <br />Sincerely, `~~ <br />~d~2~z~~~~~L <br />Kimberley A. Wolf <br />Attachments <br />\kaw <br />CF 4.1.1.3 <br />