Laserfiche WebLink
<br />GRID C <br />Thissection is the area we are seeking to aid to the peanit, <br />The area would 6e approximatly 200 feet by 300 feet or 1.37 <br />aci2s. As was stated the stone in GRID A will ram be deple <br />The stone in GRID C will insure the wntinual supply of the <br />dimension material soon to run out in GRID A. <br />As has always been true in our mining operation, there will <br />no refuse or waste. All of the stale will be separated into <br />marketable material. Nbst of the sandy soil will be relocat <br />to the upper end of the quarry for easy reclamation. Some c <br />the soil will be used to better the road aoooniing to "MDSHP <br />standards. Score of the soil will be used to reclaim parts e <br />the historic quarry in GRID B. The most i~ortant fact to <br />recoginze is that in all the years of operating this qua~~r11'', <br />we have never created any ruse and never will. The cor~inua <br />operation of this quarry is allowing us to reclaim historic <br />disturbances. <br />Sincerely, <br />Douglas J. Bachli, <br />