Laserfiche WebLink
,~ <br />PEABODY <br />,WESTERN, <br />III IIIIIIIIIIIII III <br />999 <br />Peabody Wesfem Coal Company <br />December 30, ~~ <br />Ms. Susan Morrison ~~~~~,~ <br />Reclamation specialist gy JqN 0 41993 <br />Division of Minerals and Geolo <br />1313 Sherman Street, Room 215 tit//y ~IVIS/ <br />V <br />Denver, CO 80203 F'4gG ~~ O <br />RE: Seneca II-W Mine (C-82-057) TR 19 Monitorinq~~C~CGV <br />Requirements <br />Dear Ms. Morrison: <br />Attached please find the results of three <br />monitoring surveys for stability monitoring points <br />MS-1 through MS-7 near Pond 005. As you can see, <br />the variation between surveys is very slight and <br />probably due to minor surveying inconsistencies or <br />possibly frost heave (all the points have gained <br />elevation). <br />The permit requires these surveys to be conducted <br />quarterly. The next survey is due to be conducted <br />in February. Inclement weather conditions may <br />postpone this survey. Two weeks after the survey <br />is completed, the information will be forwarded to <br />the Division. <br />Should you have any questions regarding this <br />information, please contact me. <br />bd <br />Attachment(s) <br />c: C. McCulloh <br />G. Wendt <br />Sincerely, <br />/G~- ' <br />T.J. Wa~ri h <br />4 <br />Senior Engineer <br />Peabody Weslem Coal Compony • IJ00 Sourh Cols Sewe • Flagsroff, Arizona 86001 • Telephone (601) 771-S1SS • Fas (607) 777.45% <br />