I~ Tim Ryan
<br />Fabrication Shop Manager
<br />
<br />Grass Roots Coal Mine Surface Handling Facility, West Ridge Resources, Price, Utah: ISI was
<br />the general contractor for the fabrication, erection, mechanical, and electrical work for the en-
<br />tire project. The work included an overland conveyor, reclaim tunnel, crushing structure, truck
<br />load out, ventilation fan, water tank, portal steel, water pumping facility and substation.
<br />Deca Crystallizer Project, American Soda, LLC, Parachute, Colorado. General contractor for
<br />the expansion of the process plant facility. The work included fabrication and erection of the
<br />building, vessels, and associated structures, electrical and instrumentation, piping and design.
<br />Sanborn Creek Mine Surface Expansion ,Oxbow Mining, Inc., Somerset, Colorado: ISI was
<br />the general contractor for the engineering, procurement, and construction of a 3500 TPH sur-
<br />face coal handling facility. The work included a 100 TPM Kanawha batch weigh train loadout,
<br />HSS sample system, screening building, reclaim tunnel, two concrete stack tubes, overland con-
<br />veyor, offices, and wazehouse building.
<br />Barren Solution Pump Raise Project, Cripple Creek and Victor Gold Mining Company, Victor,
<br />l ~ Colorado: ISI was the general contractor for the pump raise of the mine's barren solution lines.
<br />The pumps were raised 40 feet on three sepazate lifts to accornmodate the increase in the tail-
<br />ings pile.
<br />Storage Silos, AmerAlia, Meeker, Colorado: ISI was a subcontractor for US Filter in the de-
<br />sign, fabrication, and painting of six 17'-10" ID x 43'-4" straight side, cazbon steel product si-
<br />los.
<br />Sylvester Gulch Mine Ventilation Fan Project, Mountain Coal Company, Somerset, Colorado:
<br />ISI was a subcontractor to Frontier-Kemper for the erection of two 12' diameter, 2500 HP mine
<br />ventilation fans. The work included the fabrication of all the ducting and buildings as well as
<br />all mechanical and electrical work.
<br />Coal Prepazation Plant Modifications, Powderhorn Coal Company, Cameo, Colorado: ISI was
<br />the general contractor for the prepazation plant upgrade including the installation of two sizing
<br />screens, conveyors, and all corresponding mechanical and electrical work.
<br />Longwall Shields Project, Mountain Coal Company, Somerset, Colorado: ISI teamed up with
<br />Mountain Coal Company to refurbish the mine's longwall shields. ISI hauled 32 shields off site
<br />and worked 24 hours a day, 7 days a week in repaiting all the side and top plates and repairing
<br />numerous cracks.