Laserfiche WebLink
Reclemetion Bontl Recalculatin Worksheet-Demolition <br />• <br />Loatlout Feclllty <br />Structure ~emolNlon <br />Means Factor 99.9 <br /> Meare Base <br />SlructurerFacility/Equipment Description Dimensions Composition ~uantitiy Unit Unil COSt <br />fence 120LF chain link 120 lin.fl $ 1 78 <br />MCC at Loatlout Superstructure 28'x24'x12' 8,064 cu.ft. $ 0.73 $ <br />slab 28'x24'x0" concrete 672 sq.ft. $ 4.71 <br />Pump House at Loadout Superstructure 36'x18'x10' 6,480 cu.ft. $ 0.73 <br />slab 36'x18'x8' concrete 648 sq.ft. $ 4.71 <br />walls (3) (3)12"x6'x108LF concrete 1,944 sq.ft. $ 1360 <br />Miscellaneous Fencing 2800LF chain link 2,800 lin.tt. $ t78 <br />Railroad Tradc BSBBLF ties&Vack 8,588 lirtfl. $ 6.52 <br />ballast 1590CV ballast 1,590 w.yd. $ 2.74 <br />bridge reclamation (Adj Cypress Esl) NA Midge 1 ea $ 132,264.00 <br />500 Gallon Fuel Tanks (2) 500 gal (2) 2 ea $ 342.50 $ <br />remove sludge Irom tank bottom 500 gal 2 ea $ 145.50 <br />dispose of sludge Assume 100 gal 100 gal $ 3.45 <br />add C02 for cleaning 500 gal 15 ID $ 1.78 <br />haul tanks to certified dump 500 gal 2 ea $ 550.00 <br />3500 Gallon Tank 3500 gal 1 ea $ 342.50 $ <br />remove sludge Irom tank bottom 3500 gal 1 ea $ 145.50 <br />dispose of sludge Pssume 350 gal 350 gal $ 3.45 <br />adtl C02 for lank deanin9 3500 gal 53 Ib $ 1.78 <br />haul tank to cendied dump 3500 gal 1 ea $ 550.00 <br />12,000 and 15,000 Gallon Tanks 12,000 & 15,000 gal 2 ea $ 85500 $ <br />remove sludge from lank bottom 12,000 & 15,000 gal 2 ea $ 242.50 <br />dispose of sludge Assume 2700 gal 2700 gal $ 3.45 <br />add C02 for tank Leaning <br />• 12,000 & 15,000 gal 405 Ib $ 1.78 <br />haul tanks to certified dump 12,000 & 15,000 gal 2 ea $ 87500 <br />Concrete Disposal Charges 5621 cu.yd. concrete 5,621 cu.yd. $ 10.45 <br />Subtotal $ <br /> <br />Adjusted <br />Total Cost <br />5,840.66 <br />684.33 <br />342.16 <br />1,700.32 <br />551,037 <br />Bond Release <br />Loadoul-Structure Demo J. E. Stover Associates <br />