Laserfiche WebLink
• BRIEF RECENT PROJECT HISTORY <br />AMERICAN SODA MINING FACILITY2000-2002 <br />PROJECT DESCRIPTION,• PERFORM PROCESS PLANT INSTALLATION TO <br />INCLUDE EARTHMOVING, CONCRETE STRUCTURE INSTALLATION, PROCESS <br />PIPING, LINED EVAPORATION PONDS. <br />CONCTRACT VALUE-12 MILLION <br />ENGINEER-KVAERNER USA <br />OXBOW COAL MINING COMPANY2000-2001 <br />PROJECT DESCRIPTION,• INSTALL NEW EXTERIOR COAL HANDLING FACILTfY <br />AND PORTALL ENTRANCES FOR THE NEW ELK CREEK MINE. PROJECT TO <br />INCLUDE EARTHMOVING, ROCK EXCAVATION, PORTAL AND AIR SHAFT <br />INSTALLATIONS, CONCRETE STRUCTURES FOR THE NEW CONVEYOR SYSTEM. <br />CONTRACT VALUE-2.9 MILLION <br />ENGINEER- OXBOW IN HOUSE AND MINE AND MILL ENGINEERING <br />BNRAILROAD 2000 <br />• PROJECT DESCRIPTION,• INSTALL 10, 000 LF OF TRIPLE TRACK HOLDING YARD <br />WITH BRIDGESAND ASSOCIATED DRAINAGE SYSTEMS, REINSTALL 4 MILES OF <br />MAIN LINE TRACK TO THE PLANT FACILITY. <br />CONTRACT VALUE-1.5 MILLION <br />CAMEO COAL MINE RECLAMATION 2001 <br />PROJECT DESCRIPTION,• PERFORMEARTHMOVING OPERATIONS TO COVER <br />THE EXISTING THREE MAIN GOB PILES, DEMO THE EXISTING RECLAIM <br />TUNNEL ,INSTALL MINE DEWATERING SYSTEM,AND PLACE 250, 000 CY OF FILL <br />INTO THE PORTAL AREA TO RETURNAREA TO THE ORIGIONAL CONTOURS <br />CONTRACT VALUE-1.3 MILLION <br />ENGINEER- J.E. STOVER AND ASSOCIATES <br />CITY OF RIFLE NORTHEAST WATER LINE AND TANK PROJECT <br />2002 <br />PROJECT DESCRIPTION,' INSTALL 5000 LF OF MAIN WATER LINE, CONSTRUCT <br />NEWPUMP STATION, INSTALL A 1-MILLION GALLON BOLT UP WATER TANK. <br />CONTRACT VALUE-1.2 MILLION <br />ENGINEER-SCHMUESER GORDON MEYER, GLENWOOD SPRINGS <br />