fleclamation Bond flecalculatin Worbheet • Demolition <br /> Meats FdC10r 100.0% <br /> Means Base Adjusted <br /> Structure/Faciliry/Equipment Description Dimereions Composition Duantitiy Unit Unit Cost Total Cost <br /> -haultank to certifietl dump 10000 Gallons haul each $ 075.00 $ - <br /> -wall (8') 5'L.' 961in.N. concrete sq.N. $ 2.37 $ ~ - <br /> -wall (8') 3'L'181inN. Concrete sq.tt. $ 237 $ - <br /> slab (6' w/rods) 30" 16' concrete sq.tt. $ 2.74 $ - <br /> -slab (8' w/rods) upper 30" 26' concrete sq.N. $ 2.14 $ - <br /> Sewage Treatment Plant <br /> -Superstructure 40'L'20'W.'12'H. steel - cu.N. $ 016 $ - <br /> -slab (6'w/rods) 40" 20' concrete 800 sq.N. $ 1.61 $ 7,205 <br /> Guard Shack <br /> -Superstructure 72' x 10' x 6' wood - cu N. $ 0.14 $ - <br /> slab (6' w/rods) 72' x 10' x 6' concrete - sq.ft. $ 1.61 $ - <br /> -fence 1181in.tt. chain link - tin ft. $ 175 $ - <br /> Timber Storage Area Cutvens <br /> -24" t001intt. CMP 100 tin ft. $ 13.86 $ 1,386 <br /> -48" 1251in.N. CMP 125 lin.lt. $ 31.94 $ 3,992 <br /> -18" 1151in.N. CMP 115 tin ft. $ 10.54 $ 1,212 <br /> Belt SlrucWre <br /> -overland corneyor 3051in. N., elevaletl steel - tin ft. $ 36.76 $ - <br /> -overland corneyor 551in.N. steel - tin ft. $ 10.38 $ - <br /> -ovenand conveyor 551in.tt. steel - tin ft. $ 10.38 $ - <br /> -overland conveyor SS IinN. steel - tin ft. $ 18.38 $ - <br /> -overland conveyor 7001t.1in., elevated steel - lin.ft. $ 36.76 $ - <br /> Remaining Materials, Supplies, 8 Debris <br /> -area (azsume 50%COVerage) 420'L'40'W.'4'H. wood/metal 1,244 Cu.ytl. $ 11.14 $ 13,058 <br /> -area (azsume 50%COVerage) 360'L.'30'W.'4'H. wood metal 600 Cu.yd. $ 11.14 $ 8,912 <br />O WEST MINE-PORTAL LEVEL <br /> Shop <br /> -SUperstNctule 100'L.'S0'W.'16'H. steel - Cu.N. $ 0.16 $ - <br /> -slab (8' w/rods) 100" 50' concrete - sq.N. $ 2 14 $ - <br /> -FOOtirg (LS" 4') 151inN. concrete - IiNt. $ 19.28 $ - <br /> Fuel Station <br /> -slab (8'w/rods) 50" 40' concrete - sq.N. $ 2.14 $ - <br /> -wall (8") 5'H.'761in ft. concrete - sq. N. $ 2.37 $ - <br /> Hack Dust Bin <br /> -SupersMmcture 76'L.' 10'W.' 10'H. steel - cu N. $ 0.74 $ - <br /> -Tank 10' Diam ' 32' steel - cu.N. $ 0.16 $ - <br /> -wall (8') 4'H.' 761inft. concrete - sq.N. $ 2.37 $ - <br /> -slab (10'w/rods) 30" 16' concrete - sq.N. $ 2.68 $ - <br /> MCC <br /> -Superstructure 10'L.'6'V4.'6'H. Ender block - Cu.N. $ 0.14 $ - <br /> -Floor (6'D.w/rods) 24" 12' Concrete - Sq.N. $ 1.61 $ - <br /> Substation <br /> -Superstructure removed <br /> -slab (6'w/rods) 16" e' concrete - sq.N. $ 1.61 $ - <br /> -slab (6' w/rods) (3) 3' x 3' concrete - sq.N. $ 7.61 $ - <br /> -fence 1961in.N. chain link - lin.ft. $ t ]5 $ - <br /> Solid Waste Storage Bin <br /> -wall (6') 8'H.' S5linft. steel - lin.ft. $ 13.12 $ - <br /> -slab (e'w/rods) 22" 16' concrete - sq.tt. $ 2.14 $ - <br /> Septic Tank - 2,500 gallon <br /> -excavate and load omo trailer steel - each $ 335.00 $ - <br /> -sludge removal N/A - each $ 150.00 $ - <br /> -sludge disposal Assume 1250 N/A - gal $ 3 33 $ - <br /> RNAME? 3751hs N/A - Ib $ 1S7 $ - <br /> -haul N/A - each $ 550.00 $ - <br /> Debris Bazin 8 Riprap <br /> -Inlet SlNdure N/A steel cu.1t. $ 11.14 $ <br /> -OUtle1 Slrudufe N/A steel - cu.tt. $ 11.14 $ - <br />Bond Release <br />EaztMineBacWill Pagee d E Stover ASSOaates <br />