My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99508
DRMS
>
Back File Migration
>
Revision
>
REV99508
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:23 AM
Creation date
11/22/2007 12:27:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
2/2/2004
Doc Name
Comments to a New Proposed Reclamaton Liability
From
J.E. Stover & Associates
To
DMG
Type & Sequence
RN4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclamation Bond Recalculatin Worksheet-Oemolitlon <br />O <br />Means Factor 100.0% <br /> Means Base Adjusted <br />Structure/Faciliry/Equipment Description Dimensions Composition Ouantitiy Unit Unit Cost Total Cost <br />EAST MfNE -FAN LEVEL <br />Fan & Ass. Buildings -Remaining Concrete <br />slab (6' w/rods) (2) 15' • 15' concrete 450 sq.ft. $ 2.14 $ 964 <br />Slab (6' w/rods) 12" 72' concrete 144 sq.fl. $ 2.14 $ 308 <br />Slab (6' w/rods) 6" 6' concrete 36 sq.fl. $ 1.61 $ 58 <br />footing (1.5'x25') (8)-t2lin. tt. concrete 96 lin.tt. $ 19.28 $ 1,851 <br />footing (8'x4') (2)-641in f1. concrete 128 linft. $ 14.46 $ 1,851 <br />footing (6'%3') 481in.tt. concrete 48 lirtft. $ 14.46 $ 694 <br />footing (6'x2') (2)-81in.tt. concrete 32 lin.ft. $ 19.26 $ 617 <br />footing (1.5' x 2') (4)- 81in.tt. concrete 32 lirtft. $ 9.64 $ 308 <br />toting (05'z t.5') 1811n.f1. wncrete 18 lirtft $ 6.43 $ 116 <br />footing (1.5'x 2') 7701in.tt. wncrete 110 lirtft. $ 9.64 $ 1,060 <br />wall (8'x 12') 72' H x 110linft. concrete 1,320 sq tt. $ 2.37 $ 3,125 <br />MCC Building <br />- Superstucture e'W. ' 8'L. ' e'H. finder block 512 cu.tt. $ 0 f 6 $ 84 <br />-Floor (12'D.w/rods) 6'W.' e'L. concrete 64 sq.h. $ 3.21 $ 206 <br />-Footing (C 1'W.-2'H) 8'+8'+8'+6' wncrete 32 lirtft. $ 6.43 $ 206 <br />300,000 Gallon Water Tank <br />-Tank N/A steel 40,104 w.R. $ 0 f4 $ 5,562 <br />-patl (12' w/rods) 36' diameter wncrete 1,018 sq.h. $ 3.21 $ 3,277 <br />-piping 4'didmeter PVC 75 tin ft. $ 485 $ 364 <br />100,000 gallon water storage tank <br />-Tank N/A steel 13,368 cu.tt. $ 0.14 $ 1,654 <br />-pad (12'w/rods) 24'diameter wncrete 452 sq.tt. $ 3.21 $ 1,452 <br />-piping 6'diameter PVC 100 lin.ft. $ 4.85 $ 485 <br />Culverts <br />18" CMP 129 lirtft. $ IO i4 $ 1.360 <br />24' CMP 534 lin.ft. $ 1366 $ 7,399 <br />30' CMP 636 lirtft. $ 24.05 $ 15,293 <br />36' GMP 130 lirtft. $ 24.28 $ 3,156 <br />48' CMP 35 lintt. $ 31.94 $ 1,118 <br />Rock Slope Culverts <br />18' CMP - IinN. $ 2.90 $ - <br />21' CMP - tin lt. $ 3.30 $ - <br />EAST MINE -OFFICE LEVEL <br />Bath House <br />superstructure 100' x 50' x 36' steel - w.tt. $ 0.14 $ - <br />SupersVUClure 36' x 8' x 8' steel - cu.tt. $ 0.14 $ - <br />-Superstructure 60' x 24' 20' steel - cu.tt. $ 0.14 $ - <br />-Floor (6'D.w/rods) 100'x50' wncrete 6,728 sq k. $ 1.61 $ 10,809 <br />-Footing (1.5" 4') 361in.tt. wncrete 36 tin ft $ 19.28 $ 694 <br />Fuel Station <br />-Superstructure 98' x 25' % 12' steel - cu.n. $ 0.14 $ - <br />-Fl0ar (6"D.w/rods) 48'x i4' wncrete 6~2 sq.tt. $ 161 $ I,OBo <br />-Floor (e'D w/rods) 48' x 18' wncrete 064 sq.tt. $ 2.14 $ 1,851 <br />-Fooling (0.5"4') 48'+48'+32'+32' wncrete 160 tin ft. $ 14.46 $ 2,314 <br />-Diesel Fuel Tank (15,000 gal.) 1 @ 15,000 gallon steel - each $ 782.00 $ - <br />-Remove Slutlge N/A sludge - each $ 25000 $ - <br />-IS032Hydraulic Fluid Tank (2,500 gat.) I C 2,500 gallon steel - each $ 335.00 $ - <br />-Remove Sludge N/A sludge - each $ 150.00 $ - <br />-MOIOr Oil Tank (2,500 gal.) 7 @ 2,500 gallon steel - each $ 335.00 $ - <br />-Remove Sludge N/A sludge - each $ 150.00 $ - <br />-Gear Oil Tank (1,000 gaIJ 11,000 gallon steel - each $ 335.00 $ - <br />-Remove Sludge N/A sludge - each $ 150.00 $ - <br />-Antifreeze Tank (1,000 ga1.) 1@1,000 gallon steel - each $ 335.00 $ - <br />-Remove Sludge N/A sludge - each $ 150.00 $ - <br />-Hydraulic OilTank (10,000 ga1.) 1 @ 1Q000 gallon steel - each $ 782.00 $ - <br />-Remove Sludge N/A sludge - each $ 2so 00 $ - <br />-Insert CO2 for haulage, all Sanks f 5 Ibs/100 gal rap. N/A - Its $ 1.57 $ - <br />-Dispose of sludge -all tanks 487.5 Ib N/A Its $ 3.33 $ - <br /> -Haul Tanks (15,000 & 10,000 gal) 2 tanks N/A = Ibe $ 875.00 $ <br /> -Haul Tanks (2500 & 1000 gal) 4 tanks N/A Its $ 550.00 $ <br />MCC Building <br />Bond Release <br />EastMineBacMill Page 5 J. E Stover Assoaates <br />
The URL can be used to link to this page
Your browser does not support the video tag.