Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />8. EARTHNORK - XIGXYALL REDUGi IOM <br />Task 0~ Task Description ~ Cost (f) <br />____ I _~_____ __~~ __ I ______~ <br />NA ~ No Highwell Reduction Required <br />Subtotal (8): <br />C. EARTHNORK - PASTE/TAILINGS PILE GPPING AND/OR COVER PLACEMENT <br />Task tl~ Task Description ~ Cost (f) <br />NA ~ Upper Refuse Pile is not plamed for permit term <br />[2 ~ Grade all ungraded refuse materiel ~ 544,058 <br />13 ~ Final shaping of Lower Refuse Pile ~ f21, 270 <br />NA ~ Waste Pile cover completed in Task 40 <br />NA ~ Conpacti on of refuse material included in Task 75 <br />Subtotal (C>: 565,328 <br />D. EARTHNORK - FILL COMPACTION <br />Task C~ Task Description ~ Cost (5) <br />15 ~ Conpact graded refuse material ~ f29, 372 <br />Subtotal (D ): 529,372 <br />sheet 2 of 10 <br />