Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />TOTAL DIRECT RECLAMATION COSTS (subtate is A through P): f4,577,899 <br />II. INDIRECT COSTS <br />________________________________________________________________________ <br />________________________________________________________________________ <br />A. CONTRACTOR'S OVERNEAD 8 PROFIT <br />Item #~ Item Description ~ Cost (S) <br />______I__________~___________~____~________ _____I_~______ <br />1. ~ Public Liability Insurance..... 1.550% of direct f70,957 <br />2. ~ Contractor's Performance Bord.. 0.975% of direct (44,635 <br />3. ~ Contractor's Profit............ 10.00% of dirett~ f457,790 <br />4. ~ Job Superintendent.. ~ (98,380 <br />Subtotal (A ): f671, 762 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): f5, 249,661 <br />B. DMG PROJECT ADNINI STRATTON E%PENSES <br />Item #~ Item Description ~ Cost (f) <br />_____ I _______________~______________~__~~_~_____~__ I ~__________ <br />1. ~ Project engineering fees et.... 4.25% of corr. ~ E223,111 <br />2. ~ Staff eoYni n. expense 0.75% of corr. ~ 539,372 <br />Subtotal (B): E262,483 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 5934,245 <br />NET INDIRECT COST PERCENTAGE: 20.41% <br />TOTAL PERFORMANCE 80ND AMONNT (DIRECT plus INDIRECT costs): 55,512,144 <br />III. BOND STATUS -- BOND RELEASE SUMMARY <br />sheet 10 of 10 <br />