My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99504
DRMS
>
Back File Migration
>
Revision
>
REV99504
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:23 AM
Creation date
11/22/2007 12:27:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
10/18/1995
Doc Name
MR 168 WEST ELK MINE PN C-80-007
From
DMG
To
MTN COAL CO
Type & Sequence
MR168
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY cont'd <br />TOTAL DIRECT RECLAMATION COSTS (subtate is A through P): f4,577,899 <br />II. INDIRECT COSTS <br />________________________________________________________________________ <br />________________________________________________________________________ <br />A. CONTRACTOR'S OVERNEAD 8 PROFIT <br />Item #~ Item Description ~ Cost (S) <br />______I__________~___________~____~________ _____I_~______ <br />1. ~ Public Liability Insurance..... 1.550% of direct f70,957 <br />2. ~ Contractor's Performance Bord.. 0.975% of direct (44,635 <br />3. ~ Contractor's Profit............ 10.00% of dirett~ f457,790 <br />4. ~ Job Superintendent.. ~ (98,380 <br />Subtotal (A ): f671, 762 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): f5, 249,661 <br />B. DMG PROJECT ADNINI STRATTON E%PENSES <br />Item #~ Item Description ~ Cost (f) <br />_____ I _______________~______________~__~~_~_____~__ I ~__________ <br />1. ~ Project engineering fees et.... 4.25% of corr. ~ E223,111 <br />2. ~ Staff eoYni n. expense 0.75% of corr. ~ 539,372 <br />Subtotal (B): E262,483 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 5934,245 <br />NET INDIRECT COST PERCENTAGE: 20.41% <br />TOTAL PERFORMANCE 80ND AMONNT (DIRECT plus INDIRECT costs): 55,512,144 <br />III. BOND STATUS -- BOND RELEASE SUMMARY <br />sheet 10 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.