Laserfiche WebLink
RECLAMATION COST SUMMARY cont~d <br />N. REVEGETATION AND RESEEDING <br />Task #~ Task Description ~ Cost (f) <br />63 ~ Revegetate drill pads end roads (MR#125 and MRM126)~ 51,048 <br />76 ~ Mix 31 - Drill Seed most areas of mine site ~ (43,212 <br />77 ~ Mix #1 - Broadcast seed small areas ~ f11,606 <br />78 ~ Mix #1 - Hydroseed slopes greeted then 3:1 ~ f59,416 <br />79 ~ Nix #2 - Broadcast seed riparian areas ~ (197 <br />BO ~ Shrub Mix #1 - in all areas except ri peri an zone ~ (70,617 <br />81 ~ Shrub Mix #2 - Ri perian Zone ~ 52,184 <br />103 ~ Reseed Exploration road (MR#95) ~ 5715 <br />Subtot el (M ): f188, 995 <br />N. STRUCTURAL DEMOLITION 8 REMOVAL <br />Task <br />____ #~ <br />____~_____ <br />__ Task Descri ptian ~ <br />______________________________~_~~__~I Cost (S) <br />__~________ <br />43A I <br />~ Demolish and remove all structures, equip., 8 nat. ~ 53,278,368 <br />438 ~ Demolish structures associated w/TR#127 ~ 53,862 <br />43C ~ Demolish structures associated w/TR#70 ~ 530,616 <br />43D ~ Demolish structures associated w/TR#67 ~ 51,767 <br />43E ~ Demolish structures associated w/TR1169(MR#134) ~ 522,336 <br />43F ~ Demolish structures associated w/NR#155 ~ 51,688 <br />43G ~ Demolish structures associated w/MR#160 8 161 ~ 51,436 <br />43H ~ Demolish structures associated w/MR#162 8 164 ~ (2,964 <br /> s~totel (N): (3,343,037 <br />0. EDUIPNENT MOBILI2A7I ON / DEMOBILIZATION <br />Task #I Task Desc rip[ion ~ Cos[ (f) <br />44 ~ Haul equi Anent to and from job site ~ 517,543 <br />44A ~ Haul equipment needed far TRI167 ~ 55,340 <br />44C ~ Haul equi Anent needed for TR#69 (MR#134) ~ 512,859 <br />Subtotal (0): 535,742 <br />sheet 8 of 10 <br />