My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99478
DRMS
>
Back File Migration
>
Revision
>
REV99478
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:21 AM
Creation date
11/22/2007 12:26:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
10/14/2003
Doc Name
Enclosed Information on II West Coal Refuse to MSHA
From
Montgomery Watson Harza
To
Mine Safety & Health Administration
Type & Sequence
TR43
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q = AV„n and A= Q/V„n <br />• Where Q is the required flow through the rock underdrain (cfs) <br />Vv is average water velocity through rockfill voids (ft/sec) <br />n is drain porosity (dependent on the size consist of the rock <br />material, porosity may vary from approximately 0.8 to 1.0, use <br />1.0 to maximize drain size) <br />A = (8.6 ft3/sec)/(2.03 ft/sec x 1.0) = 4.2 ft2 <br />A 4' x 10' underdrain is the minimum specified size for a sandstone underdrain <br />for a fill of <1 MM cy (Rule 4.09.2(2)(d)). A 4' high by 10'wide triangular drain <br />has across-sectional area 20 ft2. All underdrain calculations are based on very . <br />conservative assumptions, so even applying a 2.0 multiplier as a Factor of Safety, <br />a 4' x 8' triangular underdrain configuration (16 ft2) would be more than adequate <br />(1.9 x required drain size with 2.0 Factor of Safety) to safely pass the maximum <br />anticipated infiltration flows. It is, therefore, recommended that underdrain <br />design, approval, and construction be based on a 4' x 8' triangular configuration <br />with 1H:1V sideslopes. <br />UNDERDRAIN CONSTRUCTION AND INSPECTION <br />The underdrain will be constructed ofnaturally-occurring sandstone rock and cobbles <br />• recovered during foundation preparation activities for the coal refuse facility. These <br />materials will be separated from soil materials and temporarily stockpiled along the <br />inside edge of the perimeter drains for use in construction. Underdrain construction will <br />be initiated following completion of foundation preparation activities, including clearing, <br />grubbing, soil material removal, and minor grading to establish the triangular drain <br />configuration. Underdrain construction will involve placement of 12 to 14 ounce/squaze <br />yard non-woven geo-textile material along the exposed portion of the underdrain <br />alignment, placement of suitable rock drain materials on top of the geo-textile to establish <br />a triangular drain configuration at ]east 4 feet deep and 8 feet wide, and wrapping or <br />placement of additional geo-textile over the completed rock drain to form an enclosed <br />drainage envelope. Underdrain configuration is graphically illustrated by Figure 1, <br />Underdrain Design Configuration. No more than 10 percent of the suitable rock drain <br />material will be less than 12-inches in diameter and maximum rock size will be 30 inches <br />in diameter. Geo-textile materials will have a minimum overlap of 12 inches at any joint <br />and will be anchored with metal stakes. <br />Underdrain construction will be supervised and monitored by a Registered Professional <br />Engineer. Monitoring will include grading of the design drainage configuration, <br />placement and anchoring of geo-textile materials, selection and placement of rock drain <br />materials, and completion of the geo-textile over-wrap. Underdrain construction <br />activities will be photo-documented and the inspecting engineer will prepare and submit a <br />certified inspection report to the CDMG documenting that underdrain construction was <br />• completed consistent with the approved designs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.