My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99478
DRMS
>
Back File Migration
>
Revision
>
REV99478
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:21 AM
Creation date
11/22/2007 12:26:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
10/14/2003
Doc Name
Enclosed Information on II West Coal Refuse to MSHA
From
Montgomery Watson Harza
To
Mine Safety & Health Administration
Type & Sequence
TR43
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Channel Designs <br />The surface water diversion dimensions were determined using Mannings Equation for open channel <br />flow. All channels will be either gravel- or vegetated-lined channels. If flow velocities exceed 6 feet <br />per second, the channels will be lined with riprap or erosion will be controlled with the use of rock <br />check dams. Channels will be designed with a 0.3 foot freeboard. For channels where rock check <br />dams or straw bales are installed, a 7 foot freeboard was added to the design depth. The Elk Creek <br />postmine channel will also be designed with a 1 foot freeboard. Riprap sizes were deteanined using <br />Pader, OSM or limiting velocity methods. Given the uncenainry in determining riprap sizes for steep <br />grades, a factor of safety of 3 inches was added to the riprap Ds~, designed using the Pader method. <br />The limiting velocities were determined from the "Erosion and Sediment Pollution Control Program <br />Manual", Bureau of Land and Water Conservation, Pennsylvania. The limiting velocities are shown in <br />the channel design section. The Elk Creek channel was designed using the Simons/OSM method <br />which includes abuilt-in factor-of-safety. Riprap will consist of durable rock, resistant to weathering, <br />with a uniform gradation. <br />This section contains design calculations for the following ditches: <br />• Elk Creek Mine. D-Seam Portal. and Coal Refuse Facilir~Ditches <br />Yard Ditches 1 and 2 <br />Berm Ditch <br />Refuse Ditches <br />Haul Road Ditch <br />Conveyor lA Ditch <br />East Clean Water Ditch <br />West Refuse Pile Diversion <br />West Refuse Ditch <br />East Refuse Ditch <br />Elk Creek Mine Ditches Dl, D2, D3 Upper, D3 Lower, D4, DS Upper, DS Middle, <br />DS Lower, D6, D7, DS Upper & D8 Lower. <br />IIW-2, IIW HR Upper, IIW HR Lower, IIW Clean Water Diversion, Bench Channel <br />In addition, this section contains the design calculation for the following postmine temporary and <br />permanent ditches and channels: <br />• Substation 3 Channels <br />SS-], SS-2, SS-3, & SS-4 <br />TR-43 Revised September ?003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.