My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99338
DRMS
>
Back File Migration
>
Revision
>
REV99338
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:15 AM
Creation date
11/22/2007 12:25:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979166
IBM Index Class Name
Revision
Doc Date
12/4/1997
Doc Name
BENNETT GRAVEL PIT FN M-79-166 RESPONSE TO ADEQUACY REVIEW
From
ELAM CONSTRUCTION INC
To
DMG
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. • EXHIBIT L • <br />RECLAMATION COST <br />Following is an estimate of reclamation costs on a phase by phase bases the extraction <br />area and an estimate for the Stockpile, Process & Staging area. The location of the <br />reclamined areas and phases can be found on Exhibit F. The operator will reclaim <br />disturbed areas within each individual phase prior to mining in the next phase. <br />Reclamation of the stockpile area will occure once all of the resource has been removed. <br />PHASE ONE <br />ITEM QUANITY UNIT UNIT TOTAL <br /> PRICE <br />Grading 1.3 ac $2,000.00 $2,600.00 <br />Plow and Disk 0.25 ac $300.00 75.00 <br />Seeding 0.25 ac $400.00 100.00 <br />Contingency LS 400.00 <br />TOTAL PHASE ONE $3,175.00 <br /> PHASE TWO <br />ITEM QUANITY UNIT UNIT TOTAL <br /> PRICE <br />Grading 1.1 ac $2,000.00 $2,200.00 <br />Plow and Disk 0.20 ac $300.00 60.00 <br />Seeding 0.20 ac $400.00 80.00 <br />Contingency LS 400.00 <br />TOTAL PHASE TWO $2,740.00 <br /> PHASE THREE <br />ITEM QUANITY UNIT UNIT TOTAL <br /> PRICE <br />Grading 1.5 ac $2,000.00 $3,000.00 <br />Plow and Disk 0.30 ac $300.00 90.00 <br />Seeding 0.30 ac $400.00 120.00 <br />Contingency LS 400.00 <br />TOTAL PHASE THREE $3,610.00 <br />REb'. IL23r97 L' <br />Received <br />DEC 0 3 1997 <br />Dutatl9o FIeM Otfb~ <br />plylsbn of Minerals 8 OOOIOpr <br />p F DER <br />
The URL can be used to link to this page
Your browser does not support the video tag.