Laserfiche WebLink
1 - 26 - 98 Page -2 <br />Previously the cost for reclamation was calculated by the Division at $3,646 for <br />the superstructure and $ 3,173 for the floor. The amounts calculated for MR - 24 <br />and MR - 25 are $3,761.00 and $4,195.20, respectively. An additional bond for the <br />difference of $1,137.20 will be submitted to the Division prior to construction of the <br />shop addition. Since the reclamation calculations have been corrected and give <br />evidence that the existing bond amount is adequate to reclaim even the upgraded <br />portal configuration, no additional bond will be necessary to construct the portals. <br />Please contact me should you have questions or require further information. <br />Sincerely; <br />o n M Wa'"fit r5C'1~~~ <br />Manager of Mine Services <br />