My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99207
DRMS
>
Back File Migration
>
Revision
>
REV99207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:08 AM
Creation date
11/22/2007 12:24:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Revision
Doc Date
12/5/1997
Doc Name
BEAR 3 MINE C-81-033 TR 25
From
DMG
To
MIKE BOULAY
Type & Sequence
TR25
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iiiiiiiuiiiiiiiii <br />STATE OF COw~~w <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Nawral Resources <br />1313 Sherman St., Room 215 <br />Denver, ColoraAn A0203 <br />Phone: (J03) A66-3567 <br />FAX: UOJ)A3? BI06 <br />DATE: December 5, 1997 <br />TO: Mike Boulay f <br />FROM: Susan Burgmaier <br />RE: Bear No. 3 Mine (C-81-033) <br />Technical Revision No. 25 <br />II~~~ <br />DEPAKTMEIVT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames 5. Loc hhead <br />Execmive Director <br />Michael B. Long <br />Division Dneclor <br />I have completed a preliminary adequacy review of Bear Coal Company's application for TR-25. I have <br />the following questions and comments regarding the application. <br />1. The Division is concerned with the proposed location of the pond, since it is at the toe of an <br />active slide. Bear Coal Company should consider constmcting the pond in a more stable area, <br />and if such an area would not be feasible, document that this is the case. <br />2. Has Bear Coal Company applied for a new outfall under their CDPS permit, or will an existing <br />outfall location be modified? The Division will need a copy of approval for the discharge from <br />the CDPHE before this revision can be approved. <br />3. Does Bear Coal Company intend to treat the mine water prior to discharge? If so, please provide <br />information regarding the treatment process. <br />4. Please provide additional information as to how the water from the slide area will be directed to <br />the pond. If stmctures, such as pipes or channels are to be installed, design information must be <br />included in the revision application. <br />5. The design information for the pond does not appear to consider any stormwater inflow. If the <br />pond is not intended to treat any surface mnoff, a diversion ditch will need to be designed and <br />constmcted, and stormwater considered for the pond surface and area between the diversion and <br />pond only. <br />6. Bear Coal Company needs to indicate a maximum sediment storage level for the pond, to ensure <br />that sediment levels remain below the elevation of the primary discharge pipe. <br />The certification statement indicates the pond design was developed in 1977. Please revise the <br />statement to 1997. <br />Should you or the operator have questions or need additional information, let me know. <br />5 LB\ 12097. W P W <br />
The URL can be used to link to this page
Your browser does not support the video tag.