Laserfiche WebLink
Twenrymile Coo! ComyanY- Foide! Creek Mine, TR04-44 TA Resyonses 8/12/2004 <br />Response: The text has been changed to read "Exhibit 8T." <br />Item S0. Page 2.05-84.1, line 16. Referenced Exhibit 5 was submitted as Exhibit 8T. Please <br />than eg that portion that reads "Exhibit S" to read "Exhibit 8T". <br />Response: The text has been changed to "Exhibit 8T." <br />Item 51. Page 2.05-84.1. Middle of Page. Topsoil is addressed on the page. No section <br />regarding the I S Right Intake Ventilation Shaft and Associated Facilities was found in this <br />section. See item 37. <br />Response: This section was overlooked when preparing the original revision package. A <br />section addressing topsoil handling requirements for the proposed ventilation shaft has <br />been added to the text. <br />Item 52. Page 2.05-106, 05/24/04, line 17. Reclamation is required in a contemporaneous <br />manner. To better define the schedule of reclamation work associated with this TR, lp ease <br />include the criteria for a determination ofwhen the 18 Right ventilation shaft and <br />emer ency hoist equipment are no loneer reguired to support ongoing or future mining <br />operations. Rules 1.04(4)J <br />Response: The ventilation shaft will be utilized and will remain operational so long as <br />active mining operations are occurring in the mine working areas served by the shaft. <br />Current mining plans call for completion of mining in the east and north mining districts in <br />about 2010, at current production rates. The possibility exists, however, that TCC may <br />pursue mining operations in the Wolf Creek Coal Seam from the current workings at some <br />point in the future. If this were to occur, utilization of the proposed shaft and other mine <br />support systems could be extended to coincide with the Wolf Creek operations. Given <br />these considerations, the referenced text is probably appropriate and is analogous to the <br />timing commitments for other long-term mining facilities. <br />Item 53. Page 2.05-106, line 23. The Division interprets the application to a single shaft. <br />This line suggests more than one hole. Does this apply to the grout holes (if drilled) about <br />the shaft or an additional bleeder shaft? Reclamation ofall holes, openings, etc. needs to <br />be addressed. Please clarify. <br />Response: Re: the potential pressure grout holes, please refer to the previous response to <br />Item 46. Construction of a single ventilation shaft is proposed under this TR application. <br />The referenced text has been modified to clarify this and to address sealing of the potential <br />grout holes. <br />Item 54. Page 2.05-106. IS Right Ventilation Shaft (TR 04-44) section. Please include in <br />your application a construction plan and drawing for the reclamation o the shaft. <br />facilities, and area !Rule 2.05.4/2)/g)l. <br />Response: Please refer to the previous response to Item 45 <br />