Laserfiche WebLink
ANCHOR <br />a <br />n <br />M <br />N <br />ri <br />r <br />m <br />m <br />GROUTED RIPRAP owr� <br />MATERIAL TYPE 7 <br />�2' min. MIN. THICKNESS — 2ft. <br />1 2.5' 1 <br />In 1 h <br />1 2 BEDDING LAYER <br />MATERIAL TYPE 8 <br />12 oz. GEOTEXTILE 2 VARIABLE MIN. THICKNESS 12 in. <br />FILTER FABRIC <br />35' <br />BURLAP OR <br />FILTER FABRIC h TRANSITIONS <br />FROM 3 0 STA. 12 +75 <br />TO 2 0 STA 13 +25 <br />SECTION K —K' <br />ACROSS SECTION OF SPILLWAY AT DISCHARGE POND PERIMETER BERM <br />(STA. 12+75 THRU 13+75) <br />SCALE: I"=10' <br />EXISTING <br />EMBANKMENT <br />SLOPE <br />2' GROUTED <br />RIPRAP <br />MATERIAL TYPE 7 12 oz. GEOTEXTILE <br />FILTER FABRIC <br />BEDDING LAYER/ <br />MATERIAL TYPE 8 <br />MIN. THICKNESS 12' <br />B <br />FIL <br />NOTE: <br />GROUTED RIPRAP SHALL EXTEND OVER THE ENTIRE <br />COMPOSITE SPILLWAY CHANNEL UPON ENTERING THE <br />DISCHARGE POND PERIMETER BERM. <br />1 <br />FOLDED EXISTING <br />LINER <br />DISCHARGE CHANNEL <br />EMBANKMENT <br />3 <br />_ —11 <br />GROUTED RIPRAP <br />5' MATERIAL TYPE 7 <br />I.� MIN. THICKNESS 2 ft. <br />1� <br />ANCHOR / 1� <br />TRENCH 2 <br />12 oz. GEOTEXTILE <br />FILTER FABRIC <br />BURLAP OR/ <br />FILTER FABRIC <br />TERIAL TYPE 3 RIPRAP <br />MIN. 1' THICKNESS <br />t— APPROX. 2' <br />COMPACTED EMBANKMENT MATERIAL <br />LINER <br />CROSS SECTION M —M' <br />LONGITUDINAL SECTION <br />THROUGH SPILLWAY OUTLET <br />SCALE: 1'=10' <br />DETAIL 4 <br />DISCHARGE POND <br />SCALE: 1' =5' <br />4.5' MIN. DEPTH <br />2' <br />I <br />VARIABLE <br />r � <br />SLOPE: 0.5% — 1.0% <br />EMBANKMENT MATERIAL <br />MATERIAL <br />MIN. 1' MATERIAL <br />TYPE 3 RIPRAP <br />APPROX. 4' COVER <br />FROM EXCAVATION <br />OF BERMS <br />:• •. N 14=2 <br />,J 1 <br />2 <br />MIN. <br />I I <br />12 in. <br />2.5 <br />1 11 <br />35' <br />ENGINEER <br />rn <br />Z <br />0 <br />IrN <br />w <br />No. <br />DESCRIPTION <br />ISSUED FOR CLIENT REVIEW <br />38' <br />DETAIL 3 <br />SPILLWAY OUTLET <br />SCALE: 1' =10' <br />BY <br />DH <br />PREPARED FOR: <br />BATTLE MOUNTAIN <br />RESOURCES, INC. <br />SAN LUIS PROJECT <br />RECEIVED <br />Divieion of Minerele & Geology <br />PREPARED BY: <br />y STEFFEN ROBERTSON k KIRSTE <br />Consult Ing Englneers & Scientists <br />DATE <br />TITLE: <br />DISCHARGE POND DETAILS <br />SCALE: AS SHOWN <br />6/97 <br />DRAWING No: <br />AND CROSS SECTIONS <br />DRAWING <br />4 <br />A <br />REVISION <br />PROJECT No.: 14732 <br />w <br />DESIGNED <br />KS <br />05/97 <br />0 <br />DRAWN <br />TH 06/97 <br />Permit Number �' <br />CHECKED <br />OH 06/97 <br />class:OPermit <br />Section /EExxhibil: k� ._._Z.�1._.- ._'._. ._._._._._._._._; <br />APPROVED <br />DH 06/97 <br />V Class pGevision uArG S �C °"�'Y.�°` -' - - - -' <br />APPROVED <br />Class: D Repon Hydro t7General <br />Doc Type: __ _ <br />OAppiicalion (Coal only) D Bond 4 Enlorcemenl ❑Inspection <br />(IIIII IIIII IIIII IIIII III ttlll YI� IYII! (III Iltl <br />0 0 0 1 2 2 7 1 <br />