Laserfiche WebLink
Naul tine (hours) _ <br />Return time (hours) <br />Loading time (hours) <br />Unloatling time (hours) _ <br />Subtotals = <br />JOB TIME AND COST <br />Total non-roatlable mob/tlemob wst • : Ef.42g66 <br />-M mUM Yips xtN rWl rq <br />Total rwdable mob/demob cost ": 80.00 <br />ore mum mp, ro haul rq <br />Total job time: 5.67 hours <br />Total }ob cost ~. 51,430 <br />Nearest rrejor ary or town within project area region : Salitla <br />T ataf C I T' Non- Total one-way t2vel distance: 30.0 niles <br />Roadable Roadable Average navel speetl : 45.0 mph <br />