Laserfiche WebLink
FlPR-28-2005 1026 Lf~RRC>E <br />C. EFFLUEPTf LIIoATATIONS AND CONDIITONS - SfORMWATER DISCIIAR(Ib <br />!. <br />Stwta~xr Msmaae~nt Plan fSWMPI <br />3036574212 P.12i16 <br />>'~ 5 <br />Pamit?te COG.Sa00m <br />4) Ira.afDiacharaesother~an3mrmactter.Thectotmwamxcoavey~cesysrgnontbesftesbillbeevelaated <br />forthepresmce afdiaolurgesofhathaa atmmwata, cahasttdnedrainage. ~ofl sprittgs, sanltarywaste, orpsocea, <br />wale of ary khtd Ths SWMP shall include a description of the results of utY evauation for the presenx of <br />discharges Odra than aoormwata, the tttethod used, the dace of the evaluation, sad the on-sit¢ drainage poima that <br />were dhecety observed daeing the rYnu..wn.. <br />A ~herofdischarges otherthm s0ormwateramYrwt require a CDPS hsdusorial Wastewa6erDisehargepametsnd <br />era considered Allowable Noo-Stormwater DLteharges. Plows fran fee fighting aetivitia, landscaping IRigatioa <br />moan flow or spdm~t (exoeptapoil apdnga) that are eowbiaed with stotmaatet a;sehuges aswciated with infintrial <br />activity must be identified in the SWMP. <br />3. <br />4. <br />Qualifiedpersatmel idealised bythe opaatas ahaIImales a cwaprehattsive inspection ofthtir stottttwata trlenagetaetu system, at <br />kasttvmperyea(intbaspsmewdfall),eueptuprovidedinparagtaphsdsnde,hdow. Thesecoooprehmuvefospecdonstm+st <br />be dxameo[ad and s~mnriud in the Ammal Report (see Part I.D.4 of the pemtit). <br />a. Materlalhsndsogareas,disturbedareas,areasaxdforrmraWstorage>batataaxpoaedmpraipltadoa,andotherpotetaial <br />somas ofpolhtdm idmtisad is the SWi~ is atwa[dmce with Part I.C2 ofdds peewit shall be impaoed for evidence ot; <br />or flu poxatial for, poltufanea anteing tiro dmiaage eysuem. Suacanal atormwster management ••r•n•«~, eedimeW and <br />eomro! mea+iaaa, and other aaacemal polluooa prevwHon *~~s~° identified in the plea flmU be observed m cease that <br />they era operating aotrect)y A vhval lnspectioa of egaipmmt needed m iropleroem the plan, such u ~ response <br />egtripmeok sha11 be atade. <br />b. Based oa l1u resuln of the iospeefien, the descriptive of potential polhttaat sattrces e~ polhttioa ptrovee>DOn ..,..n.... <br />idangifiedm flu plan shall be revised 4s apptupdaoe within two weeks of ouch inspection. Such reviaioas shallprovida tar <br />iwplemematioa of say changes m ~ plan in s timely mantter, bat bn no rase more rhea 60 days sitar the inspection. <br />c: A report attmnttaaing the scope of the ittspectioa, persomul making the inspection, tla: date(s) of the iaspecdoa major <br />abaervatiow rehuiag m the in>plemeantion ofher SWMP, sad aetiom takes in acooraanee withparigraph (h), above, shall <br />bcaaadcatdrotsinedas~rtoftheSWlrlPforatleasttbmeyears. ThereportshallhesigaediaaccordancewithPartl.D9 <br />of~ia permit <br />d Where aemiemual sloe itmpectlons are shown in the plan m be iarprac6tal for siks where an eaWlayee is not ardmed or <br />doesaottott~elyvisittlasix, impeefiotu asregouad inthispert~hallbe conducted ntappropriamineetvals speci5edlathe <br />plan, bat never less than atce is two yeses. <br />e. Wberesem[~nmtalaiteiospactionaaeshawatnebcplaatobeimpcaotiglforinaetivesitea(siuswberei~usotialaetivityis <br />ao langercondtteted), site impecfions ratpraed bythis put ehallbe Conducted at appaopriate iatavala specifiedm tlw plan, <br />but, inno case lns tires oatee in three years. At lease one site iaspe~ mgaited undo this part sbaU be cmdtcxd before <br />acmber 1,1999 or the date two years after mch six becomes lascwe, whichever is earlier. <br />a. SigasaaryRequiretpsan: A Dopy of the plan shall be aigaed in ucotdance with Porn I.C.6 and IA.9, sad reMiaed on six. <br />b. SWMPRavtew/Chaoges: UponrevkwoftheSWMP,theAivisicattmyaotifydmpern>uteeatutytltnethatthep]mdoes <br />tmtmeetoaeamoreoflltem¢i®omrequ~emew4oftbispenait AtleraucknodScatbn,lbepetmitaeahellatakec3aages <br />m tlm plan and shall submit m the Divisiaa mupdate m the planialudingthe requesoea ehaages. lTnless otYawiaeprovided <br />by the Diviaioa, the permlaee sbeU have 3o says after suchaoti5cetlon mboth make the ttecessarychagfs'to duplanattdm <br />implemem them. the pe:aduee shall mend dte plan rshenever there is a cbsage in design, cottaaucrian, operahoo, or <br />ice afikhhas a sigaiscanr e8eet on the potential fordo dischuge ofpollunan to the waters others Seta, er if the <br />SWMP proves m tx ineffective in achieving der: general objectives of wnKOlling polltttann in smemrrater discharges <br />assoeiseedtvilhittdtasaialaeavity. TheAivisioaiatheaamemsaoerasdeeabedsbovertteyraviewameodtaetmmtheplaa <br />It iu the permittee's responsrbility m >mtify ~tbe Colorado lXvislon of Mieurala and Geology (formerly the Maud I.aad <br />Reelanndm Aivision) of aqy siguifica>tt changes at their site tauhiag from the implemenntloa of the SWhtP. <br />