<br />BOWIE N0.2 MINE
<br />PR-03 List of Revised Pages
<br />Submittal Dated May 12, 1999
<br />
<br />i. Pages 2.04-9, 2.04-22 through 2.04-40, 2.05-1 through 2.05-5, 2.05-7 through 2.05-21,
<br />2.05-28, 2.05-32, 2.05-33, 2.05-35, 2.05-42, 2.05-48, 2.05-67 through 2.05-72, 2.05-77,
<br />2.05-79 through 2.05-89, 2.05-91, 2.05-92 through 2.05-99 (blank) in Volume I.
<br />2. Table of Contents page iii and maps (date stamped May 17, 1999) nos. 1, 2, 3, 4, IS-l,
<br />15-2, 15-3, 16, 20, 21-I, 21-2, 21-3, 22-C, 23, 32 in Volume Il.
<br />3. October 14, 19981etter in Exhibit 5 of Volume III.
<br />4. Supplemental soil report in Exhibit 7 of Volume III.
<br />5. Map 5-1 (date stamped May 17, 1999) in Volume III.
<br />6. Pages Exh-8-6 through Exh-8-l 1, Exh-8-18, Exh-8-19, Exh-8-21 through Exh-8-24, Exh-
<br />8-29, Exh-8-34, Exh-8-37 through Exh-8-39, Exh-8-49, Exh-8-55, Exh-8-56, Exh-8-58
<br />through Exh-8-58viii, Exh-8-64, Exh-8-65, Exh-8-67, Exh-8-68, Exh-8-70, Exh-8-72,
<br />Exh-8-74 through Exh-8-74iv, Exh-8-79, Exh-8-80 in Exhibit 8 of Volume III.
<br />7. CDOT letter dated 1/12/99 and Attorney-in-Fact letter in Exhibit 14 of Volume III.
<br />8. Table of Contents page v and maps (date stamped May 17, 1999) nos. FS-1, L-I, 52-1-
<br />002, 52-1-011, 98589-LOOT and 98589-L002 in Volume V.
<br />9. Table of Contents page vi and Cultural Resources Report in Volume VI.
<br />Submittal Dated July 27, 1999
<br />10. Geotechnical Engineering Report by Terracon, June 1999, except for pages 1 and 2 of the
<br />Introduction, in Tab 9 of Volume VII.
<br />11. Table of Contents page vii for Volume VII.
<br />12. Tab dividers for Volume VII.
<br />
|