Laserfiche WebLink
<br />BOWIE NO.2 MINE <br />PR-03 List of Revised Pages <br />Submittal Dated May 12, 1999 <br /> <br />Pages 2.04-9, 2.04-22 through 2.04-40, 2~7, 2.05-1 through 2.05-5, 2.05-7 through <br />2.05=-I,21, 2.05-28, 2.05-32, 2.05-33, 2.05-35, 2.05-42, 2.05-48, 2.05-67 through 34~~ <br />2.05-72, 2.05-77, 2.05-7H79 through 2.05-9+89, 2.05-91, 2.05-92 through 2.05-99 (blank) <br />in Volume I. <br />2. Table of Contents page iii and maps (date stamped May ]7, 1999) nos. 1, 2, 3, 4, IS-I, <br />15-2, 15-3, 16, 20, 21-1, 21-2, 21-3, 22-C, 23, 32 in Volume II. <br />3. October 14, 1998 letter in Exhibit 5 of Volume III. <br />4. Supplemental ng~.=;:;.;soil report in Exhibit 7 of Volume III. <br />5. Map 5-1 (date stamped May 17, 1999) in Volume III. <br />6. Pages Exh-8-6 through Exh-8-I 1, Exh-8-18, Exh-8-19, Exh-8-21 through Exh-8-24, Exh- <br />8-29, Exh-8-34, Exh-8-37 through Exh-8-39, Extt-8-49, Exh-8-55, Exh-8-56, Exh-8-SR <br />through Exh-8-SSviii, Exh-8-64, Exh-8-65, Exh-8-67, Exh-8-68, Exh-8-70, Exh-8-72, <br />Exh-8-74 through Exh-8-74iv, Exh-8-79, Exh-8-80 in Exhibit 8 of Volume III. <br />7. CDOT letter dated 1/12/99 and Attorney-in-Fact letter in Exhibit 14 of Volume III. <br />8. Table of Contents page v and maps (date stamped May 17, 1999) nos. FS-1, L-l, 52-1- <br />002, 52-1-011, 98589-L001 and 98589-L002 in Volume V. <br />9. Table of Contents page vi and Cultural Resources Report in Volume VI. <br />Submittal Dated July 27, 1999 <br />]0. Geotechnical Engineering Report by Terracon, June 1999, except for pages 1 and 2 of the <br />Introduction, in Tab 9 of Volume VII. <br />11. Table of Contents page vii for Volume VII. <br />12. Tab dividers for Volume VII. <br />