My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV98906
DRMS
>
Back File Migration
>
Revision
>
REV98906
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:54 AM
Creation date
11/22/2007 12:22:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
2/17/1999
Doc Name
TR 6 AND 7 BOWIE 2 MINE BOWIE RESOURCES LTD TR 30 BOWIE 1 MINE BOWIE RESOURCES LTD
From
DMG
To
NATURAL RESOURCES CONSERVATION SERVICE
Type & Sequence
TR7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />TE OF COLUKADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanment of Natural Resources <br />1713 Sherman SI., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (3031832-8106 <br />February 17, 1999 <br />Natural Resources Conservation Service <br />Delta Field Office <br />East Delta Industrial Park <br />690 Industrial Blvd <br />Delta, CO 81416 <br />RE: Technical Revisions Nos. 6 and 7, Bowie No. 2 Mine, Bowie Resources Ltd., <br />Technical Revision No. 30, Bowie No. I Ivtine, Bowie Resources Ltd. <br />Dear Sir or Madam: <br />D~510 <br />MINERALSr <br />bt I <br />GEOLOGI'~ <br />REC LAMATION~ <br />MINING•SA FE TY I <br />Bill Owens <br />Governor <br />Greg E. Walther <br />ExecuUVe Director <br />Michael B. Long <br />Division Drteaor <br />As a recipient of a completeness letter from this Division concerning the above-mentioned technical revisions, <br />this letter is to inform you that there has been a change in the submittal of this information. For the Bowie No. <br />2 Mine, Bowie Resources has withdrawn Technical Revision No. 6, which involved the installation of a <br />downhill conveyor, coal stockpile and truck loadout and the relocation of a sedimentation pond and Technical <br />Revision No. 7, which involved the change in the mine plan to go to longwall mining with an increase in <br />production from ?. million tons per year to 5 million tons per year. For the Bowie No. 1 Mine, Bowie <br />Resources has withdrawn Technical Revision No. 30, which concerned an increase in production at the railroad <br />loadout from 2 million tons per year to 5 million tons per year. <br />In place of the withdrawn'Cechnical Revisions Nos. 6 and 7, Bowie Resources will resubmit the information <br />under one permit revision. Technical Revision No. 30 will be submitted at a later time, again, as a technical <br />revision. <br />For your information, Bowie Resources has submitted two additional technical revisions for the Bowie No. 2 <br />Mine. Technical Revision No. 8 requests a change in the mine plan to extract coal in the west section of their <br />present permit area. Technical Revision No. 9 is a request for an incidental boundary change to the permit area <br />in order to establish mine development in federal coal. Your organization will be receiving additional <br />information on these two new technical revisions when this Division finds the submittals to be complete. <br />If you have any questions, please call me. <br />Sincerely, <br />~~ r~~ <br />seph Du ash <br />Environmental Protection Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.