Laserfiche WebLink
• <br />RECLAMATION BOND CALCULATIONS <br />Stack Tubes <br />Demolition of Concrete Footers and <br />Reclaim Tunnel Walls: <br />2,280 c.y. x $1.96/c.y. _ <br />Disposal on Site: <br />2,280 c.y. x $4.64/c.y. _ <br />Conveyor Demolition: <br />Overhead: <br />810 ft. x $20.00/f t. _ <br />Underground: <br />665 ft. x $30.00/ft. _ <br />Regrade Site to AOC: <br />64,745 c.y. x $ .50/c.y. _ <br />Revegetate: <br />1.5 a.c. x $600/a,c. _ <br />Total = <br />Rounded to = <br />RECLAMATION BOND SUMMARY <br />MCC Original Bond Amount <br />Additional Bond Rider <br />Total MCC Bond <br />Current Bond Requirements <br />Office/Bathhouse Bond Needed <br />Stack Tubes Bond Needed <br />New Bond Needed <br />New Bond Surplus <br />$446,880.00 <br />10,579.20 <br />16,200.00 <br />19,950.00 <br />32,372.50 <br />900.00 <br />$526,881.70 <br />$526,900.00 <br />$2,250,000.00 <br />800,000.00 <br />3,050,000.00 <br />$2,224,585.00 <br />147,800.00 <br />526,900.00 <br />2.899,285.00 <br />$ 150,715.00 <br />