Laserfiche WebLink
<br />Cnlorad0 Oivi si nn of Minerals and Genl ooy <br />_________________________________________ <br />ESTIMATING FORM STRUCTURAL DEMOLITION 40RK <br />____________________________________________ <br />____________________________________________ <br />sheet 1 of 2 <br />Task No.: 6 Prepared by TDG <br />Permit No.: M•78-342 Filename M342-6 <br />Date 10-Nov-92 Operation Ellison Mine <br />Permitting action Succession of Operator <br />Task description Demolish 8 remove shop, fuel tanks, 8 power line <br />MEANS Location Adjustment: 102.50% of base unit costs - MEANS SITE 40RK 8 LANDSCAPE COST DATA 1992 Edition <br /> MEANS BASSI ADJUSTED <br />STRUCTURE / FACILITY / EQU <br />__=====eecv.v= <br />.eeeeee... IPMENT DESCRIPTION I DIMENSIONS <br />. <br />cv::= <br />.. <br />.. ceeccc <br />= I COMPOSITION <br />=e <br />= I QUANTITY I <br />ao UNIT I UNIT COST I TOTAL COST <br />ee <br />Shop building l <br />eee.:=eeeeeee <br />aoo <br />.eee.eee. <br />I Assure 40'L'30'4'15'H l <br />e <br />e..eec.v <br />I steel ele <br />ee.cce.I. <br />I 18,000 I e=_ ec.I <br />cu.ft. I eceee=eece.I <br />E0.17 I .-..vee.eee <br />E3, 137 <br />Fuet tank #1 I Assume 5'diam.' 10'L I steel I 196 I cu.ft. I E0.17 I E3L <br />Fuel tank #2 I Assure 5'diam.' 10'L I steel I 196 I cu.ft. I f0.17 I ~ E34 <br /> <br />Remaining mine materials 8 I <br />debris I Assume 3'•10 "30'pile I <br />I misc. I I <br />I 900 I I <br />cu.ft. I I <br />E0.17 I <br />E757 <br /> <br />Parerline I <br />I Assume 600 ft. <br />I I <br />I steel/wood <br />~ I I <br />I 600 I <br />I I I <br />ln.f[. I <br />I I <br />51.72 I <br />I <br />E1,058 <br />I I I I I I <br />I I I I I I <br />_______________________________________________________________________________________________________________z__________________ <br />TASK SUBTOTAL sheet 1 E4,419 <br />