My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV98864
DRMS
>
Back File Migration
>
Revision
>
REV98864
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:52 AM
Creation date
11/22/2007 12:22:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Revision
Doc Date
7/2/2007
Doc Name
Letter & Application
From
J.E.Stover & Associates Inc
To
DRMS
Type & Sequence
MR41
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER 8~ ASSOCIATES, INC. <br />P.O. BOX 60340 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245-4101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />June 27, 2007 <br />Dan Mathews <br />Division of Minerals and Geology <br />101 South 3`~ Street, Suite 301 <br />Grand Junction, CO 81501 <br />Re: CAM Mining LLC, McClane Canyon Mine <br />Minor Revision Application No. 41 <br />Drilling for new Gob Pile Stability Analysis <br />Permit No. C-80-004 <br />Dear Mr. Mathews: <br />DECEIVED <br />JUL 0 2 2007 <br />Division of Reclamation, <br />Mining and Safety <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />Enclosed is an application for a minor revision to conduct geotechnical drilling at the <br />location where a proposed Gob pile will be located. The drilling is necessary in order to <br />have a stability analysis pertormed on the proposed Gob pile. Also, at the time of the <br />drilling, and alluvial well will be installed that will be used as a monitoring well upon <br />completion to gather baseline data. It is anticipated there will be 5 geotechnical holes <br />drilled, the location of the holes, is shown on attached Figure 2.2-2. The new alluvial well, <br />GW-9 is shown on attached Figure 4.2-2. Figure 4.1-7 will be updated upon completion of <br />GW-g. <br />Geotechnical holes will be sealed in accordance with sealing methods described on permit <br />page 3-21. A reclamation estimate is attached. In order to reclaim 6 holes, it will cost <br />approximately $3284. <br />The proposed Gob Pile design will be submitted at a laterdate undera Technical Revision. <br />Sincerely, <br />T' ~^~ <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: Denver Office <br />
The URL can be used to link to this page
Your browser does not support the video tag.