My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV98813
DRMS
>
Back File Migration
>
Revision
>
REV98813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:50 AM
Creation date
11/22/2007 12:21:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
Revision
Doc Date
5/10/1983
Doc Name
REMEDIAL MEASURES FOR LOWER TAILINGS DAM
From
HOMESTAKE MINING CO
To
MLRD
Type & Sequence
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z-z <br />~. <br />1 <br /> <br />J• <br />1 <br />~• <br />Standpipe-type piezometers, consisting of 1-1/2" Schedule 40 PVC with flush- <br />joint scree threaded couplings, were installed in each boring. The annulus <br />around each standpipe vas filled with sand, and the piezometers were sealed <br />above the monitoring zone with bentonite. piezometer sensitivity tests were <br />performed by evacuating the standpipes of eater and measuring the rate of <br />eater rise back into the piezometer. This vas performed both to determine <br />proper functioning of the piezometers and to obtain a measure of permeabi- <br />lity. Evacuation vas accomplished by compressed air introduced at the bottom <br />of the standpipe through a flexible hose, Eotcing the eater out the open end <br />at the top. All of piezometers appeared to be functioning properly after <br />installation. ' <br />On September 8 and 9, L982, several weeks after all construction activities <br />were completed at the dam, the piezometers were again evacuated. inert <br />nitrogen gas vas used in lieu of compressed air to avoid changes in eater <br />quality. Recovery rates were monitored. The other piezometers in the <br />vicinitq of the dam were evacuated and recovery rates monitored at the same <br />time. <br />Water quality samples were obtained from the piezometers on several dates <br />following piezometer installation, as discussed in Section 3.3 of this <br />report. This sampling and water quality testing vas performed by Homes take <br />personnel. crater quality and eater level data were forwarded to D'Appolonia <br />for review. <br /> <br />~a`~JC V~+1lAI~1~ iL~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.